South Boulder Kursrakete Nickelaktie
Seite 3 von 4 Neuester Beitrag: 24.04.21 23:03 | ||||
Eröffnet am: | 07.05.07 11:29 | von: Ohio | Anzahl Beiträge: | 89 |
Neuester Beitrag: | 24.04.21 23:03 | von: Andreayzfla | Leser gesamt: | 22.639 |
Forum: | Hot-Stocks | Leser heute: | 2 | |
Bewertet mit: | ||||
Seite: < 1 | 2 | | 4 > |
Jetzt müsste ich über One-Night Stands und Pusherei schreiben; aber das verkneife ich mir. Ist aber ein schönes Thema zum Philosophieren!!!
Eritrea Potash License Granted
der komplette Bericht :
http://stocknessmonster.com/news-item?S=STB&E=ASX&N=454236
weitere Infos :
Investor Presentation
http://stocknessmonster.com/news-item?S=STB&E=ASX&N=454240
aktuelle Infos im Wallstreet-Online forum
http://www.wallstreet-online.de/diskussion/...ralien-gold-nickel-uran
INTERSECTED AT ROSIE WITH STRONG, COINCIDENT
TEM CONDUCTORS AT DEPTH
South Boulder Mines Ltd (ASX: STB) is pleased to announce that drilling
by JV partner Independence Group NL at the Rosie Prospect has
intersected nickel- copper- PGE sulphides on all four sections drilled to
date over a 400m strike length.
Highlights are as follows:
HOLE TBDD080
• 4.13m @ 2.06% Ni, 0.22% Cu, 2.78g/t Pt/Pd from 205m including;
􀂾 0.76m @ 4.98%Ni, 0.25%Cu, 6.98g/t Pt/Pd from 207.84m
TBDD080 intersected the zone 25m down contact from previously
announced TBRC070 which intersected
• 20m @ 1.32 % Ni (0.23% Cu, 1.54g/t Pt/Pd) from 184m including;
􀂾 7m @ 2.61% Ni (0.42% Cu, 3.75g/t Pt/Pd) from 190m.
HOLE TBDD073
• 6m @ 0.83% Ni, 0.28% Cu, 0.70g/t Pt/Pd from 146m
• 4m @ 1.27% Ni, 0.10% Cu, 0.83g/t Pt/Pd from 154m including;
􀂾 2m @ 1.78% Ni, 0.09% Cu, 1.11g/t Pt/Pd from 154m
TBDD073 intersected the zone 200m east of TBDD080
• Six conductors have been interpreted from the DHTEM surveys, and
they are located below the previously drilled holes.
• Further drilling to commence at the Rosie prospect in late January.
• Bulge C2 assay results expected in late December.
complete report :
http://www.asx.com.au/asxpdf/20091221/pdf/31mvf84bcc5x59.pdf
Stunning Results from Duketon Nickel JV
South Boulder Mines Ltd (ASX: STB) is pleased to attach
Independence Group Limited’s (IGO) ASX release detailing results
received from a further 10 holes from the drilling program recently
completed at the Rosie Prospect.
About the Nickel Joint Venture
In early 2004, South Boulder entered a farm-out Joint Venture (JV)
Agreement with Independence, whereby Independence can earn a 70%
interest in the nickel rights on tenements held by South Boulder in the
Duketon Project, by the completion of a Bankable Feasibility Study within
5 years of grant of the relevant tenement.
About South Boulder Mines Ltd
Listed in 2003, South Boulder Mines (ASX: STB) is a diversified explorer
primarily focused on gold (100%), nickel (ASX: IGO earning 70%), potash
and phosphate (100%).
More information:
Lorry Hughes
Managing Director
South Boulder Mines Ltd
+ 61 (8) 9227 1144
----
DUKETON NICKEL JV – ROSIE PROSPECT DRILLING RESULTS
• Results have been received for a further 10 holes from the drilling program recently
completed at the Rosie Prospect
• Hole TBDD098 intersected 3.3m (true width) at 9.13% Ni, 1.09% Cu, 0.21% Co
and 7.09g/t PGEs (2.20g/t Pt, 1.74g/t Pd, 0.82g/t Rh, 1.79g/t Ru)
• Hole TBDD093 intersected 1.8m (true width) at 3.20% Ni, 0.41% Cu and 2.37g/t
Pt+Pd
• Hole TBDD086 intersected 3.9m (true width) at 2.23% Ni, 0.63% Cu and 2.51g/t
Pt+Pd
• Nickel sulphide mineralisation intersected over 750m of strike and 400m of dip
indicating a large system which remains open at depth and along strike
Independence Group NL (“IGO”) is earning a 70% interest in the nickel rights of the
Duketon JV tenements from South Boulder Mines Ltd (ASX code: STB). IGO has recently
completed a drilling program at the Rosie Prospect which was discovered last year.
complete report
http://www.asx.com.au/asxpdf/20100407/pdf/31pn6l0hchd4jr.pdf
Mein Kursziel in den nächsten 6 Monaten .... 1,50€
Colluli Potash Drilling Commences
South Boulder Mines Ltd (ASX: STB) is pleased to announce that
diamond drilling has commenced at it’s potentially “World Class” 100%
owned Colluli Potash Project in Eritrea.
This is a significant milestone for South Boulder and represents the first
drilling program undertaken on the project in 42 years. The 4-5 hole
program is designed to confirm historic shallow potash drilling intercepts
and provide data to complete an initial JORC resource calculation. The
program is expected to continue for the next 6-8 weeks.
“The Colluli Potash Project exhibits some outstanding potential and we
are looking forward to generating some exciting results,” said South
Boulder Mines Managing Director, Lorry Hughes.
“The key features of the Project are that we are only 70kms from the
coast, there is potential to utilise low cost solution mining and solar
evaporation and the historic mineralisation is shallow. It is hard to find a
potash project across the globe that has these features.”
“High grade ‘Houston Formation’ potash bearing horizons have been
intersected up to 45m thick in drilling only 15kms from Colluli at the
historic and world class ‘Musley Potash Project’.”
“Furthermore Allana Potash Corp. (TSX-V: AAA) at their ‘Ethiopia Potash
Project’ which contains part of the Musley potash mineralisation, have
recently confirmed significant shallow potash mineralisation. In a news
release to the TSX-V on the 15th June 2010, Allana Potash Corp, report
that chemical analyses confirmed 5.5m @ 25.8% KCl including 2.0m @
34.8% KCl in hole DK-10-02.”
“This is a great result for Allana and bodes well for South Boulder also,
as it further confirms the prospectivity of the basin. Importantly buried
potash mineralisation is typically laterally extensive so we are expecting
to confirm extensions to this mineralisation within our project area.”
Further details about the drilling program and the Colluli Potash Project
are detailed in the ASX announcement dated 27th April 2010.
Results from the program as well as progressive updates will be released
as the information come to hand.
http://asx.com.au/asxpdf/20100624/pdf/31qzkynfg1dksb.pdf
South Boulder Mines (STB)
Eritrea Colluli Potash deposit looks attractive
STB's ASX Release on 9th November 2010 confirmed its Colluli project as the world's
shallowest potash deposit. Assay results from 3 diamond drill holes confirmed medium
grade potassium chloride (KCL) intersections at widths as wide as 19.7m and high grade
intersections around 3.5m thick. It's still early days for STB as work on the Colluli Project's
pre-scoping study has only just begun, but there is little doubt that this potash deposit is
world class and will eventually be mined.
Not withstanding STB's gold and nickel assets we value STB's potash assets at $1.44/sh,
based on EV/Resource multiples for comparable potash companies. We maintain our
Speculative Buy recommendation on STB.
complete report :
http://www.southbouldermines.com.au/images/...98afe2def79ae9abee3d160
Due Diligence and Valuation Report
Arrowhead Code: 25-01-02
Coverage initiated: 15 Sep 2010
This document: 23 Nov 2010
Fair share value bracket: AS$1.61 to AS$9.33
Share price on date: AS$ 1.17
complete report
http://www.southbouldermines.com.au/images/..._report_-_22Nov2010.pdf
- Diamond core drilling (Col-007 and Col-008) has intersected additional
shallow potash mineralisation and confirm the initial exploration
target of 300-500Mt of potash ores with average grades of 21-25% KCl
(The potential quantity and grade of the Colluli exploration target is conceptual in nature and
there has been insufficient exploration to define a Mineral Resource and it is uncertain if
further exploration will result in the determination of a Mineral Resource.)
- Col-007 and Col-008 were drilled as shown on the attached map
(Figure 1) and confirms the extensive continuity of mineralisation over
at least 4.5km2. The mineralisation is considered open in all
directions;
- Hole Col-007 and Col-008 intersected a total thickness of 19.39m and
18.37m of potash respectively;
- Hole Col-007 intersected;
- 0.95m of sylvinitite from 24.50m;
- 9.71m of carnallitite from 38.29m;
- 8.73m of kainitite from 46.00;
- Hole Col-008 intersected;
- 2.40m of sylvinitite from 22.20m;
- 6.73m of carnallitite from 32.45m;
- 9.24m of kainitite from 39.18m;
- The sylvinitite mineralization in Col-008 is the shallowest intersected
to date and appears to be of a high grade nature from field diagnostic
properties. Assays up to 44% KCl have been intersected over 3.44m
from sylvinitite intercepts;
- The current drilling is part of a JORC/43-101 resource and mining
engineering study into the open pit mining and processing operation
with an initial starting capacity of 1.5Mt of potash p.a. The study will
also examine the viability of additional production of up to 3Mt of
potash p.a;
- Exploration results to date have confirmed Colluli as the world’s
shallowest buried evaporite potash deposit;
- Full drilling details and scoping study results will be released as the
come to hand.
complete report
http://www.southbouldermines.com.au/images/...98afe2def79ae9abee3d160
South Boulder Mines Limited (ASX: STB) is pleased to announce the details of
a capital raising of AUD $7 million via a placement of 3.5 million shares at an
issue price of $2.00 per share. The funds raised will be used to advance the
development of the company’s 100% owned Colluli Potash Project where
recent work has confirmed extensive shallow potash mineralisation.
The placement, at a premium to the most recently traded share price is further
validation of South Boulder’s extremely significant potash development project.
The placement will be made to Sprott Asset Management LP, (Sprott) for and
on behalf of certain Sprott Funds and managed accounts.
When the funds are received the company will have working capital of
approximately $13.5 million (including the value of listed securities which are
able to be liquidated).
More information:
Lorry Hughes
Managing Director
South Boulder Mines Ltd
+ 61 (8) 6315 1444
complete report
weiter so ...
... ich sag nur ... Frohe Weihnachten ... mein Einstiegskurs ... 18 Eurocent ...
South Boulder Mines near surface potash hits keep on coming at Colluli
In a second such announcement this week, South Boulder Mines (ASX: STB) has hit more near surface potash at the Colluli Potash Project, in Eritrea, which has the potential for the world's first open pit potash mine.
The company's current drilling program is part of a JORC study into open pit mining and processing operations, with an initial starting capacity of 1.5 million tonnes of potash annually, with the study examining the potential for production to ramp up to 3 million tonnes per year.
New diamond drilling highlights include:
- 0.75m of sylvinitite from 23.97m;
- 1.51m of carnallitite from 24.72m; and
- 9.97m of kainitite from 26.23;
Highlights from a second hole include:
- 1.02m of sylvinitite from 23.95m;
- 0.16m of carnallitite from 24.97m;
- 13.73m of carnallitite from 28.11m; and
- 13.42m of kainitite from 41.84m;
The results further confirm the initial exploration target of 300 to 500 million tonnes of potash ores with average grades of 21-25% KCl.
A recent placement of 3.5 million shares at $2.00 per share raised $7 million, providing sufficient short term cash liquidity to advance exploration and pre-feasibility studies.
In early morning intra-day trade, South Boulders shares are up $0.20, or 7% to $2.90, after hitting a company record high of $2.95 at the open of trade.
Quelle:
http://www.proactiveinvestors.com/companies/news/...olluli-10872.html
Moderation
Zeitpunkt: 16.12.10 15:55
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers
Zeitpunkt: 16.12.10 15:55
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers