Ecotality: Das ist die Zukunft!!


Seite 8 von 19
Neuester Beitrag: 28.03.14 21:38
Eröffnet am:26.11.09 16:24von: brunnetaAnzahl Beiträge:457
Neuester Beitrag:28.03.14 21:38von: JoeyRamoneLeser gesamt:133.580
Forum:Börse Leser heute:13
Bewertet mit:
5


 
Seite: < 1 | ... | 5 | 6 | 7 |
| 9 | 10 | 11 | ... 19  >  

361 Postings, 5238 Tage nullacht15danke bucks

 
  
    #176
08.09.10 16:38
aber da fehlen noch 4-5 Dollar  

1227 Postings, 5755 Tage bucks09@nullacht15

 
  
    #177
08.09.10 16:50

...ja, dafür braucht es noch ein wenig Zeit, aber trotzdem die Geduld nicht verlieren.

 

 

27135 Postings, 6203 Tage brunnetaNasdaq 4,42 $ +22,09%

 
  
    #178
08.09.10 17:27

83 Postings, 5594 Tage Bangebüchsebrunneta

 
  
    #179
1
08.09.10 17:37
wie haben wir gesagt: Die Hoffnung stribt zuletzt!
Jetzt noch den $-Kurs in EUR hinzu .... und dann ist alles gut!  

27135 Postings, 6203 Tage brunnetaIn Elektroautos investieren

 
  
    #180
09.09.10 09:03

27135 Postings, 6203 Tage brunnetaECOtality North America's Kevin Morrow to Speak

 
  
    #182
13.09.10 16:04

27135 Postings, 6203 Tage brunnetaUpdate on EV Project

 
  
    #183
16.09.10 19:00
As the project manager for The EV Project, the world's largest construction of EV infrastructure, ECOtality North America is overseeing the installation of approximately 15,000 electric vehicle charging stations in 16 cities across six U.S. states, as well as the District of Columbia. The $230 million public-private initiative is funded in part with a $114.8 million grant from the U.S. Department of Energy (DOE), funded by the American Recovery and Reinvestment Act (ARRA).

http://www.finanznachrichten.de/...-transportation-conference-004.htm

27135 Postings, 6203 Tage brunneta15.000 Elektrofahrzeug Ladestationen in 16 Städten

 
  
    #184
17.09.10 12:16
Vertretern in Staaten von Alaska, Kalifornien, Oregon Washington

http://www.finanznachrichten.de/...-transportation-conference-004.htm

27135 Postings, 6203 Tage brunnetaWir schaffen Arbeitsplätze und wirtschaftliches

 
  
    #185
21.09.10 14:26

27135 Postings, 6203 Tage brunnetaECOtality Reveals EV Infrastructure Plan for

 
  
    #186
22.09.10 17:24

27135 Postings, 6203 Tage brunnetaThe EV Project

 
  
    #187
22.09.10 17:31

27135 Postings, 6203 Tage brunnetaECOtality plots EV charging stations

 
  
    #188
23.09.10 07:16

68 Postings, 5567 Tage ollo11Was für eine...

 
  
    #189
26.09.10 21:37

SCHEISSE hier. Wird langsam mal Zeit, dass das Ding aus dem Arsch kommt. Da haben uns die Kulmbacher ja einen schönen Mist angedreht...

 

27135 Postings, 6203 Tage brunnetaECOtality erweitert EV Infrastructure Plan für

 
  
    #190
29.09.10 14:18
Oregon, Zugänge PacifiCorp als EV Projektpartner


Zuletzt kündigte Blink Network Standorte in Ashland und Medford Stärkung der staatlichen EV Infrastruktur entlang der I-5 Gang

http://translate.google.de/...mp;sl=en&tl=de&hl=&ie=UTF-8

http://www.finanznachrichten.de/...corp-as-ev-project-partner-004.htm

27135 Postings, 6203 Tage brunnetaNews 05.10.2010 14:19

 
  
    #191
05.10.10 14:27

27135 Postings, 6203 Tage brunnetaECOtality to Unveil New Fast Charging Technology

 
  
    #192
13.10.10 12:11

27135 Postings, 6203 Tage brunnetaECOtality Introduces Blink DC Fast Charger, The

 
  
    #193
1
13.10.10 14:18
Fastest, Intuitive EV Charging Station Available

EV Drivers Can Charge Quickly and Smartly On the Go

ECOtality, Inc. (NASDAQ: ECTY), a leader in clean electric transportation and storage technologies, today unveiled the newest addition to the Blink Network product line of electric vehicle (EV) charging stations, the Blink DC Fast Charger. The DC Fast Charger delivers the fastest EV charging rate currently available and is capable of providing a full charge in less than 30 minutes. With plans to install more than 155 charging stations, the DC Fast Charger will play a key role in electrifying major transportation corridors within The EV Project.
Blink DC Fast Charging Station (Photo: Business Wire)

Blink DC Fast Charging Station (Photo: Business Wire)

"The Blink DC Fast Charger breaks the conventional theories behind EV charging by providing drivers the option to charge at common commercial locations in under a half hour," said Jonathan Read, CEO of ECOtality. "The EV infrastructure that we are creating through the Blink Network will allow EV owners to drive anywhere, without limitations. DC Fast charging is integral to this initiative, as it allows drivers to fully charge in an efficient manner, or 'top-off' as needed, without time constraints."

EV Charging Made Easy

Ideal for commercial installations, the Blink DC Fast Charger incorporates quick and easy-to-use options for consumers, while maximizing business opportunities, beneficial to commercial hosts. ECOtality worked with frog design, a world-class innovation firm, to create the charging stations.

"The DC Fast Charger offers the same simplicity, ease-of-use, and timeless design presented in the Blink family of commercial and residential chargers, enhancing ECOtality's robust charging network that is key to helping consumers adopt an EV lifestyle," said Paul Bradley, Executive Creative Director for frog design.

Charge Safely and Intelligently

The Blink DC Fast Charger is outfitted with two CHAdeMO compliant electric vehicle charging connectors, which are used on fast-charge-capable electric vehicles worldwide. The connectors prevent accidental disconnection, and include intuitive connector docking for protection and storage. Safe in wet or dry use, the cables and connectors can withstand being driven over by a vehicle. Utilizing ECOtality's patented sequential charging technique, the Blink DC Fast Charger's dual port design allows two cars to plug in at the same time. When one EV completes charging, or finishes a programmed charge, charging will automatically begin on the other.

An internal meter is included to support energy usage data evaluation, AMI Interface and Smart Meter capability allows for demand response and energy management. The DC Fast Charger is also capable of handling multiple input current settings to conveniently accommodate electric service capabilities.

The Blink Network

As part of an interconnected network of Blink charging stations, the Blink DC Fast Chargers offer drivers a variety of features to ensure the best charging experience. Two color touch-screen interfaces provide information on charge status, statistics and cost, convenient payment options and billing information, and connects to the Blink Network web portal for further information delivery. The built-in programmable start/stop timing functions as well as the capability for reservation systems allow for increased time-savings.

Through the Blink Network Smartphone Application users are able to locate charging stations and receive directions via GPS navigation. Users are also able to check on charge status remotely and receive completion or interruption of charge notifications that are sent to the phone.

Maximizing Business Potential

Businesses will be able to take advantage of advertising opportunities available through the Blink Network. Each Fast Charger is outfitted with a 42" LCD display, and Blink Network media content can be both tailored to specific markets and broadcast nationally across Blink Network charger locations. Additionally, the chargers offer retailers the ability to develop coordinated campaigns to display relevant content and promotions, extending the consumer experience.

The exterior treatments and graphics are customizable and allow commercial hosts to rebrand according to their specifications. In creating the Blink Network, ECOtality worked with Landor, a strategic consulting and design firm, to craft an easily recognizable, yet customizable brand.

"The retail sector will play a large role in encouraging the consumer adoption of electric vehicles," added Don Karner, President of ECOtality North America. "The Blink DC Fast Charger offers the features that will attract consumers and commercial partnerships and build a rich network of charging stations. ECOtality is thrilled to be developing and deploying the products that will lead the EV industry to success."

ECOtality will begin to deploy Blink DC Fast Chargers through partners of The EV Project at commercial locations as early as March 2011.

As project manager for The EV Project, ECOtality is supervising the construction of the largest deployment of EV infrastructure to date. The $230 million public-private initiative is funded with a $114.8 million grant from the U.S. Department of Energy through the American Recovery and Reinvestment Act (ARRA). The EV Project includes 16 cities and major metropolitan areas in six states, and will result in the installation of approximately 15,000 charging stations in 2011.

Additional information about the DC Fast Charger is included in the product spec sheets, available for download on the new Blink website: www.blinknetwork.com.  
Angehängte Grafik:
3-4_view_webready.jpg
3-4_view_webready.jpg

27135 Postings, 6203 Tage brunnetaECOtality teams with BP on charging stations

 
  
    #194
1
14.10.10 08:58
ECOtality Inc., the company behind the federally funded EV project, announced Wednesday a partnership with BP Products North America Inc. to install publicly available car chargers at 45 BP and ARCO gas stations in target markets by March, 2011.

Owners of electronic vehicles will be able to use ECOtality's speedy Blink DC Fast Chargers, which boast a full charge in less than 30 minutes.

The markets targeted for the gas-station chargers include Portland, Eugene, Corvallis and Salem in Oregon; Phoenix and Tuscon in Arizona; San Diego and Los Angeles in California; Seattle and three cities in Tennessee.

"When people think of refueling their cars, they think of gas stations and we're excited to work with BP to demonstrate a new way of fueling cars to the American driver," said Jonathan Read, CEO of ECOtality in a press release.

ECOtality rolled out its plans for an Oregon EV charging infrastructure last month.


Read more: ECOtality teams with BP on charging stations - Portland Business Journal

http://www.bizjournals.com/portland/stories/2010/...html?surround=lfn

1227 Postings, 5755 Tage bucks09wow...

 
  
    #195
15.10.10 08:31

..das geht ja wieder mal in die Höhe...schön anzusehen und Balsam für die geschundene Investorseele!

Viel Erfolg allen Investierten!

 

27135 Postings, 6203 Tage brunneta@bucks09: Ich habe auch nichts anderes erwartet.

 
  
    #196
15.10.10 09:36
D i e  z u k ü n f t i g e  M o b i l i t ä t  i s t  e l e k t r i s c h

http://www.zukunft-elektroauto.de/

CO2-Reduktionspotenzial von Elektrofahrzeugen

http://www.zukunft-elektroauto.de/pageID_8368818.html

Das erste Serien-Steckdosenauto

http://www.rp-online.de/auto/news/iaa/...eckdosenauto_aid_759908.html

Auf dem Weg zur Elektro-Weltherrschaft

http://www.auto-motor-und-sport.de/eco/...artnerschaften-1476485.html

Schnelle Stromtankstelle

http://derstandard.at/1252036954498/Schnelle-Stromtankstelle

Die weiteren Top 10 der Forenlieblinge im Schnelldurchlauf:

Mit Motion Network, Cord Blood America und Ecotality

http://www.dailyresearch.de/archives/...cker-Aktien!-Fortsetzung.html

1227 Postings, 5755 Tage bucks09@brunneta

 
  
    #197
1
15.10.10 09:55

Ja! Auch ich denke, wir werden noch viel Freude mit unserem Investment haben.
Viel Erfolg weiterhin!

 

27135 Postings, 6203 Tage brunnetaECOtality Unveils Plans to Electrify Arizona's

 
  
    #198
19.10.10 14:20
Sun Corridor

EV Deployment Blueprints Include Potential Charger Sites for Phoenix Metro Area

http://www.finanznachrichten.de/...ify-arizona-s-sun-corridor-004.htm

http://translate.google.de/...mp;sl=en&tl=de&hl=&ie=UTF-8

9 Postings, 6000 Tage EcoFandanke deraktionaer

 
  
    #199
20.10.10 17:24

Bin seit 2009 in diese Aktie investiert, seit ist dieses Invest nur noch die Hälfte Wert!

 

27135 Postings, 6203 Tage brunnetan Israel wird derzeit ein landesweites Netz

 
  
    #200
21.10.10 07:33
aus rund 500.000 Ladestationen für Elektroautos installiert. Unter der Schirmherrschaft von Staatspräsident Shimon Perez wollen Renault und der ehemalige SAP-Manager Shai Agassi bis 2011 ein Elektroautro mit rund 200 Kilometern Reichweite etablieren – und das Land so von Ölimporten unabhängiger machen.

http://www.boersenpoint.de/blog/...trie-imperium-bundelt-kompetenzen/

Seite: < 1 | ... | 5 | 6 | 7 |
| 9 | 10 | 11 | ... 19  >  
   Antwort einfügen - nach oben