VG Gold ( ISIN: CA9182161021 )


Seite 584 von 796
Neuester Beitrag: 10.01.11 16:04
Eröffnet am:19.08.07 12:37von: harry74nrwAnzahl Beiträge:20.883
Neuester Beitrag:10.01.11 16:04von: fishbetLeser gesamt:2.203.036
Forum:Hot-Stocks Leser heute:1.326
Bewertet mit:
54


 
Seite: < 1 | ... | 582 | 583 |
| 585 | 586 | ... 796  >  

7974 Postings, 6953 Tage louisanerWow

 
  
    #14576
4
08.09.09 20:13
...41gpt in 25m Tiefe.
das kann man ja schon fast mit dem Spaten ausbuddeln.

24234 Postings, 7868 Tage harry74nrwgerne geschehen

 
  
    #14577
2
08.09.09 20:13
gerade zufällig lesen

und das sehr geniale !! an der Oberfläche !!! Phase 2 geht tiefer !!!

http://www.vggoldcorp.com/pressreleases/09/090820109.pdf

jetzt aber gutes Nächtle und die CAN machen lassen

824 Postings, 6345 Tage SteveFist sicher nur ein Appetizer

 
  
    #14578
1
08.09.09 20:19
für die Konferenz ;-)  

2565 Postings, 6522 Tage PaiMeiGute Publikation!

 
  
    #14579
08.09.09 20:20
So versteht man die BEs. IR müsste das Papier jetzt noch in's Deutsche übersetzen (lassen) für die deutschen Investoren.
VG Gold ist meiner Meinung nach auf dem richtigen Wege und die nächsten "high grade (p)funde" werden nicht mehr lange auf sich warten lassen.
PaiMei

7974 Postings, 6953 Tage louisanerVGP-09-04 ist auch nicht schlecht

 
  
    #14580
1
08.09.09 20:22


VGP-09-04 15.5m bis 21.2m 5.7m! 1.46gpt 47.0m Total length,

 

aber VGP-09-05  und 09 sind noch reicher und fast unter der Grasnarbe.

 


 

3094 Postings, 6965 Tage PANGÄA$$ VG INSIDER 07 09 2009 latest 10 filings updated

 
  
    #14581
4
08.09.09 20:58

VG Gold Corp.(VG)

As of September 7th, 2009
Filing DateTransaction DateInsider NameOwnership TypeSecuritiesNature of transaction# or value acquired or disposed ofUnit Price
Sep 02/09Sep 01/09Lexam Explorations Inc.Direct OwnershipWarrants16 - Acquisition under a prospectus exemption24,905,186 
Sep 01/09Sep 01/09Lexam Explorations Inc.Direct OwnershipCommon Shares16 - Acquisition under a prospectus exemption24,905,186$0.080
Jul 23/09Jul 21/09Lexam Explorations Inc.Direct OwnershipWarrants16 - Acquisition under a prospectus exemption12,594,814$0.150
Jul 23/09Jul 21/09Lexam Explorations Inc.Direct OwnershipWarrants00 - Opening Balance-Initial SEDI Report  
Jul 23/09Jul 21/09Lexam Explorations Inc.Direct OwnershipCommon Shares16 - Acquisition under a prospectus exemption12,594,814$0.080
Jul 23/09Jul 21/09Lexam Explorations Inc.Direct OwnershipCommon Shares00 - Opening Balance-Initial SEDI Report  
Jul 02/09Jun 23/09Meredith, Thomas W.Direct OwnershipCommon Shares10 - Acquisition in the public market15,000$0.095
Jun 10/09Jun 10/09Meredith, Thomas W.Direct OwnershipCommon Shares10 - Acquisition in the public market10,000$0.110
Jun 08/09May 28/09Tait, John GrahamDirect OwnershipOptions50 - Grant of options200,000$0.150
Jun 07/09Jun 03/09Falconer, AlexanderDirect OwnershipOptions50 - Grant of options100,000$0.150
 

36496 Postings, 7205 Tage Jutodie news scheint gut

 
  
    #14582
6
08.09.09 21:19
aufgenommen zu werden.
so ein bestätigung kann auch genutzt werden,
um erst mal zu verkaufen.  
Angehängte Grafik:
p.gif
p.gif

3094 Postings, 6965 Tage PANGÄART 0,5 CAN $ wieder erreicht !!

 
  
    #14583
2
08.09.09 21:30

145 Postings, 6155 Tage MullingarSieht ja wirklich

 
  
    #14584
6
08.09.09 21:31
nicht schlecht aus. Und so nah an der Grasnarbe.
Jetzt bitte mit etwas Schwung durch die 50 Cent.
Auf jeden Fall ist unter dem Einfluss von McEwen schon mehr Geschick bei den News zu spüren.  

3094 Postings, 6965 Tage PANGÄAVolumen mit über 600k ist Hammermäsig !

 
  
    #14585
4
08.09.09 21:53

591 Postings, 6621 Tage feliz07@louisaner

 
  
    #14586
08.09.09 21:57
wo kann man das nachlesen mit den Bohrlöchnern wie tief das ist ?

Gruss feliz  

2565 Postings, 6522 Tage PaiMeiJemand in CAN will die 0,50 ... zur Zeit: 0,495

 
  
    #14587
1
08.09.09 21:57

2565 Postings, 6522 Tage PaiMeiSpannung steigt ....

 
  
    #14588
2
08.09.09 22:00
Angehängte Grafik:
0495_kurz_vor_schluss.png (verkleinert auf 48%) vergrößern
0495_kurz_vor_schluss.png

1062 Postings, 6356 Tage RubelJohnyschade

 
  
    #14589
1
08.09.09 22:02
trotz der guten news und des guten Volumens heute ist VG an 0,50 gescheitert
genau so wie Gold an 1000
trotz des schwachen Dollars

wenn die Amis nicht wollen
dann wird es auch nicht  

1062 Postings, 6356 Tage RubelJohnyLöschung

 
  
    #14590
1
08.09.09 22:05

Moderation
Zeitpunkt: 09.09.09 08:08
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers

 

 

2565 Postings, 6522 Tage PaiMeiAufregender Abend ...

 
  
    #14591
6
08.09.09 22:06
Windows 7 Enterprise 90 Day Trial installiert ... ohne Absturz
MS Office 2010 Technical Preview installiert ... ohne Absturz

und VG Gold in D über 0,30 ... ohne Absturz
und VG Gold in CAN fast 0,50 ... kleiner Absturz, nicht der Rede wert

und VG Gold BEs, die sich sehen lassen können!!!
Pilgervater, was hälst Du davon?
Gute Nacht,
PaiMei

24234 Postings, 7868 Tage harry74nrwabwarten

 
  
    #14592
1
08.09.09 22:07

549 Postings, 6481 Tage Weggefährte@Pay

 
  
    #14593
7
08.09.09 22:11
...es gibt nun offensichtlich einen Zusammenhang zwischen Vg-Kurs und Deiner Software! Wieso hast uns diesen Trick früher nie verraten? Hätten wir ja damit viel Geld verdienen könnten!  

410 Postings, 7342 Tage ZockieVG GOLD.....WE ARE GOLD!

 
  
    #14594
1
08.09.09 22:13
Filing Services Canada       |
FSC / Press Release


Paymaster West Project Off to Strong Start in Timmins, Ontario!

41.67 GPT Gold Over 1.8 M & 14.31 GPT Gold Over 2.7 M

Toronto, Ontario CANADA, September 08, 2009 /FSC/ - VG Gold Corp. (VG - TSX, VN3 - FWB), is pleased to announce that initial core drilling from its Paymaster West Project in Timmins, Ontario has successfully intersected high-grade, near surface, gold mineralization, including 41.67 gpt (grams per tonne) (1.22 opt (ounces of gold per ton)) over 1.8 meters (m) (5.9 feet (ft)).  VG Gold has the option to earn a 60% interest in Paymaster West Project from Goldcorp. The project is situated next to Goldcorp's Dome Mine that has produced 17.1 million ounces of gold.

DRILL RESULT HIGHLIGHTS
(All Results Table 1& 2)

-***-

--------------------------------------------------
Hole Number Gold Grade Interval     Gold Grade Interval

--------------------------------------------------
             (gpt)      (m)          (opt)      (ft)
--------------------------------------------------

--------------------------------------------------
VGP-09-07     14.31      2.7           0.42      8.9
--------------------------------------------------
VGP-09-10     41.67      1.8           1.22      5.9
--------------------------------------------------
VGP-09-10      5.25      10.6          0.15      34.8
--------------------------------------------------

-****-

PHASE I DRILLING

Phase I drilling successfully confirmed the presence of near surface, widespread gold mineralization at the Paymaster West Project. All of the holes targeted gold mineralization between 15 m (50 ft) and 90 m (300 ft) below surface (Figure 3). Since drilling occurred close to the previously mined areas most of the holes encountered underground openings with 6 of the 12 holes having to be terminated prior to their targeted depth.  

The presence of high-grade gold mineralization in the upper areas outside of the previously mined areas indicates that there is excellent exploration potential not only at depth, but also close to surface.

Gold mineralization at the Paymaster West Project is hosted within strongly altered and well mineralized quartz feldspar porphyry.  Alteration consists of pervasive ankerite and sericite alteration with local tourmaline, both disseminated and in veins.  Pyrite mineralization is disseminated throughout, with local concentrations to 20%.  Visible Gold (VG) was noted in 2 holes.


PHASE II DRILLING UNDERWAY
Focused on High-Grade at Depth

Based on the successful Phase I drilling, VG Gold has mobilized a second diamond drill to the Paymaster West Project.  Phase II drilling will consist of 6,000 meters (19,685 ft) and will target porphyry hosted high-grade gold mineralization located between 150 m (500 ft) and 300 m (1,000 ft) below surface and beneath the historic mine workings.

PAYMASTER PROJECT HISTORICAL SUMMARY

The Paymaster West Property is located in the center of the historic Timmins mining camp (68 million ounces of gold produced) and borders Goldcorp's Dome Mine, which has current and past production totaling of 17.1 million ounces of gold. The gold mines in the Timmims Gold Camp have been mined to depths exceeding 2,000 m (6,560 ft).    

Production and exploration on the Paymaster West Project occurred between 1910-1928 to an approximate depth of 245 m (800 ft). During the 1940's-1950's a series of core holes successfully intersected high-grade gold mineralization over good widths at depth. This drilling occurred at depths at 460 m (1,500 ft) and at 760 m (2,500 ft) below surface and demonstrated the excellent exploration potential of the Paymaster West Project. For historic drill results, please click: http://www.vggoldcorp.com/downloads/Drill_Hole_Table_Paymaster.pdf    


VG GOLD.....WE ARE GOLD!

QUALIFIED PERSON

All exploration work was conducted under Kenneth Guy, P. Geo., designated Qualified Person for VG Gold, who has reviewed the this press release. Gold analysis of samples collected by VG Gold were assayed by Laboratoire Expert in Rouyn-Noranda, Quebec. Analysis consisted of a fire assay of a 30-gram sample with an atomic absorption finish. Samples assaying over 1.0 gram per tonne Au are re-assayed with gravimetric finish. Samples noted to contain visible gold are analyzed via total metallic assay method. A rigorous Quality Control and Assurance program (QA/QC) is in place, using control samples such as Blanks and Rocklabs Standards and duplicate checks. In addition, duplicate analyses of 10% of the samples were corroborated by check assays on sample performed by Bourlamaque Laboratory of Val D'Or, Quebec.

For further information contact Tom Meredith, President of VG Gold, 416 368 0099.

To learn more about VG Gold (TSX:VG), visit our website: www.vggoldcorp.com  

The TSX Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.    

Please see the following tables for results from the 12 holes drilled and reported.  The first 6 holes presented reached the targeted depth. The following 6 holes failed to reach target depth due to underground openings from historic mining that occurred from near surface to depth of 600 feet (200 metres) deep.

Tables 1 and 2 are metric (grams and metres) and the tables 3 and 4 are imperial (feet and ounces).

Paymaster West Diamond Drill Results Phase                                                                             Table 1
(Metric)

Holes Reaching Target Depth

-***-

--------------------------------------------------
Hole #   From   To   Interval  Au   Total Length Section (ft)  *
           (m)   (m)   (m)    (gpt)       (m)      (Easting)

--------------------------------------------------
VGP-09-06 48.2  49.4    1.2    11.23    143.5         6200     1 ugo
--------------------------------------------------
And       59.4  67.1    7.7    2.07
--------------------------------------------------

--------------------------------------------------
VGP-09-07 117.7 125.3   7.6    1.85     152.0         6200     1 ugo
--------------------------------------------------
         137.5 140.2   2.7    14.31
--------------------------------------------------

--------------------------------------------------
VGP-09-10 25.9  27.7    1.8    41.67    119.0         6100     4 ugo
--------------------------------------------------
         62.2  72.8    10.6   5.25
--------------------------------------------------
         86.3  97.0    10.7   2.55
--------------------------------------------------

--------------------------------------------------
VGP-09-12 95.7  105.8   10.1   3.39     143.0         6000     2 ugo
--------------------------------------------------

--------------------------------------------------
VGP-09-14 46.0  47.5    1.5    2.43     152.0         5700
--------------------------------------------------

--------------------------------------------------
VGP-09-15 48.1  53.7    5.6    4.49     149.0         5700
--------------------------------------------------
*ugo = underground opening

-****-





Holes Failing to Reach Target Depth                                                                        Table 2

-***-

--------------------------------------------------
Hole #   From   To   Interval  Au   Total length Section (ft)      *
         (m)     (m)    (m)   (gpt)       (m)     (Easting)        

--------------------------------------------------
VGP-09-04 15.5  21.2    5.7    1.46      47.0         6200        1 ugo*
                                                             +end in ugo

--------------------------------------------------
And       25.9  32.3    6.4    1.92
--------------------------------------------------

--------------------------------------------------
VGP-09-05 13.4  18.9    5.5    2.52      38.0         6200        2 ugo
                                                             +end in ugo

--------------------------------------------------

--------------------------------------------------
VGP-09-08                                23.7         6100     end in ugo

--------------------------------------------------

--------------------------------------------------
VGP-09-09 24.1  24.6    0.5    13.03     76.2         6100        3 ugo
                                                             +end in ugo

--------------------------------------------------
And       36.9  44.0    7.1    2.44
--------------------------------------------------

--------------------------------------------------
VGP-09-11                                53.9         6000     end in ugo

--------------------------------------------------

--------------------------------------------------
VGP-09-13                                48.4         5900     end in ugo

--------------------------------------------------
*ugo = underground opening

-****-

Notes:
* Lengths reported are core intersection lengths and do not represent true widths.
* It is anticipated that true width estimates will be made possible after additional drilling.

Paymaster West Diamond Drill Results Phase                                                                             Table 3
(Imperial)

Holes Reaching Target Depth

-***-

--------------------------------------------------
HOLE #   FROM    TO   INTERVAL  AU   TOTAL LENGTH SECTION (FT)   *
         (FT)    (FT)   (FT)   (OPT)       (FT)    (EASTING)    

--------------------------------------------------
VGP-09-06 158.1 162.1    3.9    0.33     470.8         6200     1 ugo
--------------------------------------------------
And       194.9 220.1    25.3   0.06
--------------------------------------------------

--------------------------------------------------
VGP-09-07 386.2 411.1    24.9   0.05     498.7         6200     1 ugo
--------------------------------------------------
         451.1 460.0    8.9    0.42
--------------------------------------------------

--------------------------------------------------
VGP-09-10 85.0   90.9    5.9    1.22     390.4         6100     4 ugo
--------------------------------------------------
         204.1 238.8    34.8   0.15
--------------------------------------------------
         283.1 317.9    35.1   0.07
--------------------------------------------------

--------------------------------------------------
VGP-09-12 314.0 347.1    33.1   0.10     469.2         6000     2 ugo
--------------------------------------------------

--------------------------------------------------
VGP-09-14 150.9 155.8    4.9    0.07     498.7         5700
--------------------------------------------------

--------------------------------------------------
VGP-09-15 157.8 176.2    18.4   0.13     488.8         5700
--------------------------------------------------
*ugo = underground opening

-****-


Holes Failing to Reach Target Depth                                                                        Table 4

--------------------------------------------------
Hole #   From    To    Interval  Au   Total length Section (ft)       *
         (ft)     (ft)   (ft)   (gpt)       (ft)    (Easting)        

--------------------------------------------------
VGP-09-04 50.9   69.6     18.7   0.04     154.2         6200     1 ugo*
                                                             +end in ugo
--------------------------------------------------
And       85.0   106.0    21.0   0.06
--------------------------------------------------

--------------------------------------------------
VGP-09-05 44.0   62.0     18.0   0.07     124.7         6200    2 ugo
                                                             +end in ugo
--------------------------------------------------

--------------------------------------------------
VGP-09-08                                  77.6         6100   end in ugo

--------------------------------------------------

--------------------------------------------------
VGP-09-09 79.0   80.8     1.6    0.38     250.0         6100      3 ugo
                                                            +end in ugo

--------------------------------------------------
And       121.3  144.4    23.3   0.07
--------------------------------------------------

--------------------------------------------------
VGP-09-11                                 176.8         6000  end in ugo

--------------------------------------------------

--------------------------------------------------
VGP-09-13                                 158.8         5900  end in ugo

--------------------------------------------------
*ugo = underground opening

-****-


Notes:
* Lengths reported are core intersection lengths and do not represent true widths.
* It is anticipated that true width estimates will be made possible after additional drilling.



Source: VG Gold Corp.,  (TSX: VG) http://www.vedron.com
Maximum News Dissemination by Filing Services Canada Inc. *  

36496 Postings, 7205 Tage Jutogenau,

 
  
    #14595
5
08.09.09 22:13
zieh dir noch ein paar
programme drauf ( sag vorher bescheid)  

2565 Postings, 6522 Tage PaiMeiÜberlege noch, was man da weiter machen könnte, ..

 
  
    #14596
2
08.09.09 22:28
... nach vielen Jahren der Entwicklung (ich meine jetzt nicht die Softwär-Entwicklung) sollte VG Gold Corp. in Zukunft etwas absturzsicherer geworden sein. Ich denke weiter, durch McE mit im Boot ist unser T.M. etwas mehr gefordert als früher. Der Wind weht nicht mehr ganz so streng von vorne ... man könnte sogar glauben, dass wir im Moment etwas "Rückenwind" geniessen.
Mein Wunsch: Jetzt nicht das "Momentum" verlieren und d'ran bleiben am Bohren| am Explorieren | am Berichten | am Analysieren | die Investoren bei Laune halten !
PaiMei

3094 Postings, 6965 Tage PANGÄASK MIT VOLUMEN, bis Morgen

 
  
    #14597
5
08.09.09 22:32

Charts for Vg Gold Corp.  (VG:CA)  
$ 0.485  0.025 (+5.43%) Volume: 639.49 k15:59 EDT 08.09.2009
Intraday
 Line OHLC Candle Area

683 Postings, 6529 Tage Bargte42 gpt ...

 
  
    #14598
5
08.09.09 22:38
unterhalb der Grasnarbe....danke GC  
Ich stelle mir die Frage war es Strategie oder Dümmlichkeit.
VG befindet sich jetzt im mitten im Dreieck. Goldpreis>Bohrergebnisse/Resc.>McE
Die 50 c in Can sind keine Hürde mehr.  

2422 Postings, 7079 Tage Mathi0304gewollt

 
  
    #14599
4
09.09.09 09:07
die BE waren soweit gewollt und sehr gut vorbereitet, der Kurs durfte trotzdem nicht über die 0,50$ weil Investoren auf der Road Show nochmal die möglichkeiten haben sollen billig zu investieren.
Ich persönlich denke die Wissen auch schon mehr über die nächsten BE, interessant wäre auch mal wieder Neuigkeiten über telefonische Rücksprache mit Tom zu halten.
Wäre jemand bereit dies zu tun ?? wir sollten aber die Road Show abwarten.

P.s. 0,50$ ist eine kleine Hürde, ab Montag werden wir schon weit drüber stehen.

2021 Postings, 5684 Tage fernseherUnter 0,30

 
  
    #14600
1
09.09.09 10:14
gibt wohl niemand mehr seine Stücke ab.
Biete 0,305, aber niemand will verkaufen.  

Seite: < 1 | ... | 582 | 583 |
| 585 | 586 | ... 796  >  
   Antwort einfügen - nach oben