GAMESA Rückenwind in Zahlen und Aufträgen
es würde mich wundern, wenn sie dann noch die Zustimmung für den ADWEN-Zukauf kriegen, so gross waren ja die Gewinne nicht, dass sie all das stemmen können
http://www.gamesacorp.com/en/communication/news/...cifica=0&texto
http://www.gamesacorp.com/en/communication/news/...cifica=0&texto
http://renews.biz/102228/gamesa-wins-china-double
http://www.reuters.com/article/us-siemens-gamesa-idUSKCN0X51M3
gleichzeitig verkündete er gegenüber der Rheinischen Post weiteren Stellenabbau im Energiesektor. Kaeser hatte Anfang Mai erklärt, dass über den Abbau von insgesamt 9000 Arbeitsplätzen durch den Konzernumbau hinaus noch einmal 4500 Jobs weltweit wegfallen sollen, davon 2200 in Deutschland. Hintergrund sind die anhaltenden Schwierigkeiten in der Stromerzeugungssparte (Power & Gas).....
http://www.rp-online.de/wirtschaft/unternehmen/...abbau-aid-1.5123142
http://www.boerse-online.de/nachrichten/aktien/...-Spanien-1001140202
Siemens-Chef Joe Kaeser hat Verzögerungen beim geplanten Zusammenschluss der Windkraftsparte des Konzerns mit dem spanischen Konkurrenten Gamesa eingeräumt. "Die Medienberichte sind zutreffend", sagte Kaeser am Freitag in Düsseldorf bei einer Diskussionsveranstaltung der "Rheinischen Post" auf eine entsprechende Frage. Mehr gebe es nicht zu sagen, fügte er hinzu.
Hindernis auf dem Weg zu einer Fusion ist Insidern zufolge ein Gemeinschaftsunternehmen von Gamesa und der französischen Areva, das die Fusion verzögere. Ein Insider hatte Reuters gesagt, Siemens sei eigentlich nicht an den Aktivitäten der Franzosen interessiert. Die "Süddeutsche Zeitung" hatte später berichtet, Siemens könnte den Anteil doch übernehmen.....
Under the terms of the agreement, Gamesa will handle the transportation, installation and commissioning of 9 of its G97-2.0 MW turbines. Delivery of the turbines is set to begin in September 2016, with the facility slated for commissioning in the first quarter of 2017. The agreement also encompasses the provision of operations and maintenance services for 15 years......
http://www.gamesacorp.com/en/communication/news/
Specifically, the company will install 2 G97-2.0 MW wind turbines at Rodbaston wind farm, located in central England; 2 G80-2.0 MW at French Farm, placed in Eastern England; 6 G87 at Mynydd Portref, in South Wales; 4 G80-2.0 MW at Mynydd Brombil, also located in South Wales, and three G80-2.0 with a rated power at 1.66 MW each in Brackagh Quarry, a wind farm placed in Northern Ireland.These 17 wind turbines are planned for delivery during the second half of this year and the wind farms are expected to be operational some months later.
http://www.gamesacorp.com/en/communication/news/
Since it is a turnkey contract, Gamesa will also provide the infrastructure needed to install and operate the facility and will service the wind farm on a long-term basis. The wind farm's commissioning is scheduled for September 2016.
It is worthy to note that Gamesa has already commissioned over 140 MW of wind projects for ReNew Power across Maharashtra and Karnataka and this order will be the fourth order from ReNew Power.
http://www.gamesacorp.com/en/communication/news/
The company developed Energy Thrust to increase production across its 660-kW, 850-kW and 2.0-MW platforms by up to 5%.
This upgrade will be installed at 54 Iberdrola wind farms in Spain, Portugal, Italy, Hungary, Romania, Greece and Cyprus.
Gamesa, a global technology leader in wind energy, has reached an agreement with Iberdrola for the installation of its Energy Thrust software, which boosts turbine efficiency and, in turn, production ratios, at wind farms with capacity of 1,602 MW.
Under the terms of the agreement, the upgrade software will be installed in wind turbines made by Gamesa with aggregate capacity of 1,602 MW fitted in 54 Iberdrola wind farms located in Spain, Portugal, Italy, Hungary, Romania, Greece and Cyprus.
http://www.gamesacorp.com/en/communication/news/
http://www.boerse-social.com/2016/04/22/...renault_schneider_electric
http://www.iwr.de/news.php?id=31188
Reuters quoted GE renewables head Jerome Pecresse as telling reporters in Paris that the company was in "favour of a strong French offshore industry and a consolidation of the French players would contribute to that. We look at the evolution of Adwen's capital with interest".
Pecresse said no talks had been held with the companies involved in Adwen but that one large French offshore wind manufacturer would be more sensible than two small ones.
Reuters further quoted Pecresse as saying that GE has “the ambition to become one of the three major players in the offshore wind market” behind Siemens and MHI Vestas.
http://renews.biz/102524/adwen-of-interest-to-ge
das könnte den Weg für Siemens freimachen
The company maintains the profitable growth envisaged in its Business Plan 2015-2017 and registered its highest-ever EBIT: €119 million (+81%1).
Revenue growth to €1,064 million in the first quarter reflects the group's solid position and the commercial success of its new products.
In a context of rising activity, Gamesa strengthened its balance sheet and ended the quarter with a net cash position of €194 million.
These results ratify the company's good performance and assure attainment of the 2016 guidance.
Net profit excluding the impact of Adwen amounted to €80 million (+82%1 vs. 2015, which included a one-off positive impact of €18 million from the joint venture).
The company maintains the profitable growth envisaged in its Business Plan 2015-2017 and registered its highest-ever EBIT: €119 million (+81%1)......
http://www.gamesacorp.com/en/communication/news/
http://www.finanznachrichten.de/...h-zum-thema-gamesa-bedeckt-015.htm
..The increases were down to record volumes – almost 1.1GW, up 49% – and earnings before interest and tax that amounted to €119m.
Gamesa increased revenues by 30% in the first quarter to €1064m. The revenue growth was mainly in the wind turbine area, which was up 34% on the same period last year.
Operation and maintenance revenues were stable, at €108m, Gamesa said.
Latin America contributed 27% of wind turbine sales in terms of MW, followed by India and Europe, the Middle East and Africa, 26% each).
The US accounted for 16% and Asia-Pacific for 5%, Gamesa said.
Orders in the first three months of 2016 were 1.031GW, bringing the total order book at the end of March to 3.167GW.
Turbines – strong volumes and commensurate margin expansion
The Turbine division drove the beat. Order intake was up 26% to 1,031MW, leaving the backlog essentially unchanged versus Q4’15 at 3.2GW. Order growth was driven by Europe (up 4x YoY) and the US, partly offset by India (-12%) and LatAm (-34%). Volumes grew by 49% to 1,061MW, with turbine revenue growing 34% to €956m. The disconnect between volume and revenue growth arose from a higher-than-usual delta between turbines leaving the factory (“Activity” as reported by Gamesa) and turbines erected in the field....Turbine margins expanded 3.6% YoY to 10.9%. Volume drove most of the expansion, but Q1 benefited from a particularly strong mix as well, as Gamesa executed a number of large projects in the quarter. Fixed costs rose as the company invested in further capacity to accommodate expected sales growth.
Services – Still affected by defecting customers, but green shoots showing.......
http://thecorner.eu/companies/54222/54222/
Im Vergleich zum ersten Quartal des Vorjahres haben sich Umsatz, das operative Ergebnis und das Nettoergebnis jeweils deutlich verbessert. Das liegt vor allem am starken Geschäft im Onshore-Windkraftbereich.
Auch die Gamesa-Aktie legte am Donnerstag nach der Vorlag der Zahlen um 2,6 Prozent zu und zählte damit zu den größten Gewinnern im RENIXX World, dem globalen Aktienindex für erneuerbare Energien. Am heutigen Freitag legt das Papier bislang um weitere 1,5 Prozent auf 17,37 Euro zu (Stand 11:12 Uhr, Börse Stuttgart) Getrübt wurden die Finanzzahlen ein wenig vom Offshore-Joint-Venture Adwen, das Gamesa zusammen mit Areva eingegangen ist.
Aufbau des Offshore-Geschäfts kostet noch
Gamesa hat den Gesamtumsatz in den ersten drei Monaten 2016 gegenüber dem Vorjahr um rund 30 Prozent auf 1,06 Milliarden Euro verbessert (Q1 2015: 820 Mio. Euro). Das Ergebnis vor Zinsen und Steuern (EBIT) fiel mit 119 Mio. Euro um 81 Prozent höher aus als im Vorjahr (Q1 2015: 66 Mio. Euro), wobei in dieser Kennziffer die Beiträge durch das Offshore-Joint-Venture herausgerechnet wurden. Unter Berücksichtigung von Adwen liegt das EBIT-Plus lediglich bei etwa 25 Prozent. Der Nettogewinn liegt ohne Adwen bei 80 Mio. Euro, inklusive des negativen Adwen-Beitrags in Höhe von -8 Mio. Euro bei 72 Mio. Euro (+15 Prozent gegenüber Q1 2015). Grund ist der Aufbau und die Zusammenlegung des Offshoregeschäfts im gemeinsamen Projekt mit Areva. ......
http://www.eleconomista.es/empresas-finanzas/...sion-con-Siemens.html
Im November hatte GE schon Alstom erworben,es gab Ärger wegen Entlassungen von 6500 Leuten in Europa danach, auch in Frankreich. Frankreichs Präsident Hollande forderte Rechenschaft – und bestellte den Chef ein. Alstom hatte danach Verluste
http://www.handelsblatt.com/my/unternehmen/...r=Organisation_11804700
Auch Siemens ist nicht zimperlich bei Entlassungen zu Gunsten besserer Gewinne
http://www.br.de/nachrichten/...tellenabbau-prozessindustrie-100.html
The facility will have the capacity to manufacture 250 blades or 500MW a year and will be inaugurated in September.
The plant, which will be located in the town of Nellore, is expected to employ 400 people.....
http://renews.biz/102637/triple-time-for-gamesa-in-india
Das System in La Muela (Aragon) hat eine Gesamtleistung von über 2 Megawatt und kombiniert Photovoltaik, Windkraft, Dieselgeneratoren und Energiespeicher. Der Prototyp besteht aus einer Windturbine mit 850 kW, 816 Solarmodulen mit insgesamt 245 kW und drei Dieselgeneratoren mit je 222 kW. Im Sommer soll ein Energiespeicher mit 500 kWh/500 kW hinzugebaut werden. Das Gesamtsystem ist dann in der Lage, den Strombedarf von 400 Familien zu decken......
http://www.solarserver.de/solar-magazin/...uer-netzferne-gebiete.html
This transaction reinforces Gamesa's strategic positioning in predictive turbine maintenance technology and falls under the scope of its 2015-2017 Business Plan objectives with respect to the development of value-added O&M products
The applications developed by NEM will take the data mining already being performed by Gamesa across its maintenance fleet to the next level by anticipating potential incidents, so perfecting turbine performance and operations planning..
http://www.gamesacorp.com/en/communication/news/
http://www.reuters.com/article/gamesa-ma-siemens-areva-idUSL5N18G398?