6562 Postings, 5798 Tage SemperAugustusNordex tells Reuters has met 2010 targets

 
  
    #76
21.01.11 14:13

www.finanznachrichten.de/nachrichten-2011-01/...-2010-targets-020.htm

21.01.2011 11:37 

BRIEF-Nordex SE tells Reuters has met 2010 targets

FRANKFURT, Jan 21 (Reuters) - Nordex Se:

* Tells Reuters has met 2010 targets

((Frankfurt Newsroom; +49 69 7565 1272))

 

(For more news, please click here)

 

COPYRIGHT

 

Copyright Thomson Reuters 2011. All rights reserved.

The copying, republication or redistribution of Reuters News Content, including by framing or similar means, is expressly prohibited without the prior written consent of Thomson Reuters.

 

 

© 2011 AFX News

 

6562 Postings, 5798 Tage SemperAugustusWarum die Meldung nur auf Englisch???

 
  
    #77
21.01.11 14:39

Ist doch schonmal gut, dass die Ziele für 2010 erreicht worden sind. Aber müsste die Meldung nicht auch auf Deutsch kommen?

 

1005 Postings, 5417 Tage studichaotnoch keine Pressemitteilung

 
  
    #78
21.01.11 15:38
auf der Nordexhomepage, wird aber sicherlich noch kommen. Dadurch erhoffe ich mir nochmal etwas Kaufdruck. So long stay cool!  

1005 Postings, 5417 Tage studichaotNordex kommt mit 500 Jobs nach Hamburg

 
  
    #79
21.01.11 16:05

Die Ansiedlung mit 500 Arbeitsplätzen ist eine der größten aus der  Wachstumsbranche. Die Verwaltung steht künftig in Hamburg-Langenhorn.

Hamburg. Der Rostocker Windkraftanlagenbauer Nordex kommt nach Hamburg. "Hamburg ist eine ideale Basis für unsere internationale Expansion, sagt Thomas Richterich, Vorstandsvorsitzender der Nordex SE. Das Unternehmen konzentriert seine Hauptverwaltung in einem ökologischen Neubau in Hamburg-Langenhorn. Gemeinsam mit Hamburgs Erstem Bürgermeister Christoph Ahlhaus nahm Nordex heute die neue Unternehmenszentrale offiziell in Betrieb. Mit rund 500 Arbeitsplätzen ist dies eine der größten Neuansiedlungen aus dem Bereich erneuerbare Energien in der Hansestadt. Ahlhaus: "In den letzen Jahren hat der Hamburger Senat seine Wirt-schaftspolitik konsequent auf Zukunftstechnologien ausgerichtet. Für immer mehr GreenTech-Unternehmen ist Hamburg der Standort Nummer Eins. Dafür ist die Nordex SE das beste Beispiel. Die neue Firmenzentrale leistet einen unverzichtbaren Beitrag, um Hamburg und seine Metropolregion als bedeutsames Zentrum zukunftsgerichteter Energien weiter zu festigen und den diesjährigen Titel „Umwelthauptstadt 2011“ mit Leben zu füllen.“ Das Nordex-Forum verfügt über eine Bruttogeschossfläche von rund 15.000 m2 und über Raum für bis zu 700 Arbeitsplätze.

 

http://www.abendblatt.de/wirtschaft/...mit-500-Jobs-nach-Hamburg.html

 

6562 Postings, 5798 Tage SemperAugustusAlso 1 Milliarde Umsatz und

 
  
    #80
21.01.11 16:33

zweistelliger Millionengewinn?

Das fänd ich ganz gut so! Kommt natürlich auch auf den Ausblick für 2011 an.

 

6562 Postings, 5798 Tage SemperAugustusNordex erreicht Jahresziele (ARD-Börse)

 
  
    #81
1
21.01.11 16:38

boerse.ard.de/content.jsp

Nordex erreicht Jahresziele
Der Windkraftkonzern Nordex hat seine Geschäftsziele für vergangenes Jahr wohl erreicht. Man erwarte "keine Überraschungen" sagte Vorstandschef Thomas Richterich der Nachrichtenagentur Reuters. Jüngst hatte Nordex seine Umsatzprognose von etwa 1,2 Milliarden Euro auf rund eine Milliarden Euro gesenkt, was einem leichten Rückgang entsprechen würde. Vor allem das erste Halbjahr 2010 war wegen dem wachsenden Wettbewerbsdruck und dem schwachen USA-Geschäft enttäuschend ausgefallen. Die TecDax-Aktie legt heute leicht zu.

 

1005 Postings, 5417 Tage studichaotNordex 2011: Ende der Flaute?

 
  
    #82
24.01.11 10:54

1005 Postings, 5417 Tage studichaotNordex wird zu einem Nischenplayer

 
  
    #83
24.01.11 10:58

1005 Postings, 5417 Tage studichaotNordex- Analysteneinschätzung Deutsche Bank

 
  
    #84
24.01.11 14:58

1005 Postings, 5417 Tage studichaotNordex- Mal eine andere Aussage der Deutschen Bank

 
  
    #85
1
24.01.11 15:15
Bei der Deutschen bank geh es ja zu wie im Verteidigungsministerium und der Bundeswehr:

04.01.2011

Branche mit Flügeln

Den Zukunftsmarkt Windenergie haben deutsche Unternehmer frühzeitig erkannt und besetzt. Jetzt profitieren sie von ihrer weltweiten Vorreiterrolle.

Klimaschutz wird zum einträglichen Geschäft – ob für Planungsbüros, Projektfinanzierer oder Gießereien, die bis zu 40 Tonnen schwere Naben en bloc herstellen. Weil das deutsche Know-how in Sachen Windkraft weltweit gefragt ist, sind die Auftragsbücher der Anlagenbauer für zwei Jahre im Voraus gut gefüllt – mindestens. „Bei Zulieferteilen gibt es bereits Engpässe“, sagt Thorsten Herdan, Geschäftsführer des Fachverbandes VDMAPowersystems. Obwohl die Hersteller ihre Fertigungskapazitäten um über zehn Prozent im Jahr aufstocken, übersteigt die Nachfrage das Angebot. Und der Bedarf wird steigen: Einerseits kommen energiehungrige Schwellenländer auf den Geschmack, andererseits nimmt die Installation von Windenergieanlagen auf See immer konkretere Formen an. „Die Klimadiskussion wird uns in den nächsten Jahren weiter Rückenwind geben“, sagt Herdan.

Die boomende Branche kommt in Bewegung – das bestätigt eine aktuelle Untersuchung von Deutsche Bank Research: „Erste Engagements und Übernahmen zeigen die Begehrlichkeiten traditioneller Energiekonzerne“, sagt Studienautor Josef Auer. Seit dem Jahr 2000 habe sich die weltweit installierte Windkraftkapazität vervierfacht. Deutschland ist mit einem Weltmarktanteil von 37 Prozent führend in der Herstellung von entsprechenden Anlagen und Komponenten und profitiert so in besonderem Maße. Auer ist sicher, dass der Aufwind mittelfristig anhält: „Bis 2015 wird sich die Windenergiekapazität verfünffachen.“ Grund auch für die Deutsche Bank, sich mit einem neuen Expertenteam auf den Wachstumsmarkt zu konzentrieren. „Rückwirkend betrachtet, bildete der Einstieg in die Windenergiebranche vor mehr als neun Jahren den Beginn für unser heutiges umfangreiches Engagement in diesem Bereich.

Das durch den Aufbau eines ‚Expertenteams Greentech‘ zusätzlich
entstehende Know-how wird uns hier auch technisch noch besser positionieren“, sagt Wilhelm von Haller, Mitglied der Geschäftsleitung Firmenkunden Deutschland und des Management Committee Deutschland der Deutschen Bank. Die stürmische Entwicklung der Windenergiebranche, so von Haller, strahle auch auf andere Bereiche des Maschinenbaus aus, etwa den gesamten Bereich Antriebstechnik.

http://www.firmenkunden.deutsche-bank.de/de/...etter_windenergie.html  

1005 Postings, 5417 Tage studichaotNordex- steckt unveraendert im Abwärtstrend

 
  
    #86
24.01.11 16:40
http://www.godmode-trader.de/nachricht/...rend-Nordex%2Ca2447601.html

Börse: Xetra in Euro / Kursstand: 5,61 Euro

Rückblick: So Recht gelang es der Nordex Aktie bisher nicht die übergeordnete und seit November 2007 eingeleitete Abwärtsbewegung zu beenden. Wenngleich durch die im Dezember des vergangenen Jahres markierten Kurstiefs bei 4,25 Euro zunächst eine Stabilisierung gelang.

Ist im Hinblick auf die steiler und steiler verlaufenden Abwärtstrendlinien erst ein klares Überschreiten dieser als klare Beendigung des Abwärtstrends zu interpretieren. Unterhalb dieser Abwärtstrendlinien bleibt die grundsätzliche Chartsituaion fortwährend bearisch mit der Tendenz einer Trendfortsetzung.

Charttechnischer Ausblick: Bei Rückschlägen unter das Niveau von 5,25 Euro auf Wochenschlusskursbasis ist eine Korrektur bis wenigstens 4,25 Euro einzukalkulieren. Unterhalb dieser letzten Tiefs ist, im Sinne der primären Tendenz, mit einer Korrekturforsetzung bis etwa 3,50 Euro zu rechnen.

Hingegen oberhalb von 5,95 Euro auf dem Weg zur Befreiung aus dem langjährigen Abwärtstrend zwar immer noch einige Hürden voraus liegen, doch werden mit Überwindung dieses Niveaus weitere Aufschläge bis rund 7,00 Euro und überdies bis 8,38 Euro möglich.

Kursverlauf vom 01.02.2008 bis 21.01.2011 (log. Kerzendarstellung / 1 Kerze = 1 Woche)  

1005 Postings, 5417 Tage studichaotGodmodeTrader-Chart

 
  
    #87
24.01.11 16:42

14 Postings, 5056 Tage TTradeLangfristiger Kreuzwiderstand in Kürze erreicht?

 
  
    #88
24.01.11 22:44

Hallo erstmal! Dies ist mein erster Beitrag !

Hab einfach mal nach Stockstreet-Manier nen paar Trendlinien in den Langfrist-Chart eingezeichnet und einen m.E. doch ziemlich deutlichen wenn auch nicht 100% präzisen Kreuzpunkt Ende Januar/ Anfang Februar entdeckt  - das magische Alpha-Target ?!

 

 
Angehängte Grafik:
nordexlang.jpg (verkleinert auf 62%) vergrößern
nordexlang.jpg

14 Postings, 5056 Tage TTradeFortsetzung zu #88

 
  
    #89
24.01.11 22:48

Meine Prognose:

Das Überwinden dieses Kreuzwiderstands leitet langfristigen Aufwärtstrend ein!

 

 
Angehängte Grafik:
nordexkurz.jpg (verkleinert auf 62%) vergrößern
nordexkurz.jpg

189 Postings, 5982 Tage Ralf.Aber nur wenn

 
  
    #90
25.01.11 06:06
wir oberhalb des 38 Tage Chart bleiben.
Sonnst sehe ich noch mal die 5,00.  

6562 Postings, 5798 Tage SemperAugustus20.000 MW Windfarm in China!

 
  
    #91
2
01.02.11 07:37

Alleine dieses Projekt wird so ziemlich alles an Windanlagen aufsaugen!

Gansu Wind Farm
From Wikipedia, the free encyclopedia
Jump to: navigation, search
Gansu Wind Farm
Country China
LocaleGansu
StatusUnder construction
Construction began2009
Commission date2020
Owner(s)multiple
 
Power station information
Primary fuelWind
 
Power generation information
Installed capacity5,160 MW
Maximum capacity20,000 MW

The Gansu Wind Farm (also called Jiuquan Wind Power Base) is a group of large wind farms under construction in western Gansu province in China. The project is one of six national wind power megaprojects approved by the Chinese government. It is expected to grow to 20,000 megawatts by 2020, at an estimated cost of 120 billion Chinese yuan ($17.5 billion). The project is being developed by more than 20 developers[1] in two localities in Guazhou County and near Yumen City.[2] As of November 2010 the installed capacity is 5,160 MW.[3]

The project is divided to multiple phases. The first 3,800 MW phase of 18 200 MW and 2 100 MW wind farms is planned to be completed by 2010. The second 8,000 MW phase will consist of 40 200 MW farms. The planned total capacity is 5,160 MW by 2010, 12,710 by 2015 and 20,000 in 2020.[1]

In 2008, construction began on a 750 kV AC power line to carry electricity from the wind farm, [4] and construction of the wind farms themselves started in August 2009.[1]

 

quelle: Wikipedia

 

 

 

6562 Postings, 5798 Tage SemperAugustus4000 MW Windfarm in den USA

 
  
    #92
1
01.02.11 07:48

Wenn schon die Ölindustrie auf Windparks setzt...

Pampa Wind Project
From Wikipedia, the free encyclopedia
Jump to: navigation, search

Mesa Power, a company controlled by former Texas oilman, T. Boone Pickens, planned to build the world's largest wind farm, called the Pampa Wind Project, as part of the Pickens Plan. The proposed 4,000 MW facility was to be located near Pampa, Texas, which is on the Texas Panhandle, and stretch to the east, spanning 400,000-acre (1,600 km2) in five counties. This would provide enough power for 1.5 million average homes. Mesa Power placed an order for the first shipment of 667 wind turbines from General Electric — the world's largest wind turbine order for a single location — and this will provide 1,000 MW of wind power capacity for the $2 billion first phase of the project, which should be online by 2011.[1][2] Lease payments for the land used by the turbines were expected to cost $65 million a year. The total cost of the project was estimated at $8–10 billion.

By way of comparison, as of May 2008, the largest U.S. wind plant is the Horse Hollow Wind Energy Center with a capacity of 736 MW.

On July 17, 2008, the Texas Public Utilities Commission approved ratepayer funding of $4.98 billion in electric transmission lines to connect wind farms in the Texas Panhandle to the electric grid.[3] This implements the provisions of a 2005 Texas law designed to promote new wind energy projects.[4]

On March 2, 2009, Mesa announced that it was proceeding with the first phase of the project, but had put off work on the later phases, and canceled 120 of 197 wind leases.[5] In July 2009, Pickens delayed (but did not cancel) the project, citing the lack of transmission capacity to the site and poor credit market. The Pampa Wind Farm project will be revived in 2013, when transmission lines are due to be completed in the area. In the meantime, Mesa will use the 667 contracted-for turbines to build several smaller wind farms; locations have not yet been chosen.[6][7]

 

quelle:Wikipedia

 

6562 Postings, 5798 Tage SemperAugustus5050 MW Windpark USA

 
  
    #93
1
01.02.11 08:32
Titan Wind Project
From Wikipedia, the free encyclopedia
Jump to: navigation, search
Titan Wind Project
Titan Wind Project is located in South Dakota
Location of Titan Wind Project in South Dakota
CountryUnited States
LocaleHand County, South Dakota
Coordinates44°30′58″N 99°12′6″W&#65279; / &#65279;44.51611°N 99.20167°W&#65279; / 44.51611; -99.20167Coordinates: 44°30′58″N 99°12′6″W&#65279; / &#65279;44.51611°N 99.20167°W&#65279; / 44.51611; -99.20167
StatusPhase I operating
Commission datePhase I: 2009
Owner(s)BP Wind Energy[1]
 
Power station information
Primary fuelWind farm
Generation units10 Liberty Wind Turbines, @2.5 MW
 
Power generation information
Installed capacityPhase I: 25 MW

The Titan Wind Project is a proposed 5,050 MW wind farm project, formerly known as Rolling Thunder, based in South Dakota. The project developers, Clipper Windpower and BP Alternative Energy, expect to build Titan in several phases and, when completed, it will be one of the largest wind farms in the world.[2][3][4]

The complete wind farm would use up to 2,020 of Clipper's Liberty 2.5 MW wind turbines.[2]

Contents

 [hide]
 

[edit] Production

Operating at full capacity, the project would be able to supply the electricity for 100% of the households in the state several times over. South Dakota's entire electricity consumption in 2005 was 9.811 TWh.[5] At an assumed capacity factor of 25% (probably conservative for windy South Dakota), a 5.05 GW nameplate capacity would correspond to an annual generation of:

(5.05 GW) × (0.25) × (365 days/year) × (24 hours/day) × (1 TWh/1000 GWh) = 11.0595 TWh

[edit] Phase I

Construction of phase I began in 2009 on a 7,500-acre (30 km2) site in Hand County in the Ree Hills south of Ree Heights.[1] The project was complete by the end of the year.[6] Phase I consists of 10 Liberty C89 2.5 MW wind turbines for a combined nameplate capacity of 25 MW. Northwestern Energy has a long-term power purchase agreement.[6][1]

[edit] Renewable Energy Objective

In 2008, the South Dakota legislature passed a Renewable Energy Objective. The bill is mostly a symbolic gesture, as it's not a mandate, only an objective. Furthermore the obective is only 10% by 2015. Considering that hydroelectric dams already produce about 45% of the state's electricity, that objective will likely be met.[7][8]

[edit] See also

 

quelle:Wikipedia

 

6562 Postings, 5798 Tage SemperAugustus40.000 MW

 
  
    #94
1
01.02.11 08:44

sind alleine bei den 10 größten geplanten Windparks weltweit momentan geplant!

Insgesamt dürfte das wohl bei über 100.000 MW liegen!  Da kann man sich schwer vorstellen, dass hier auch Nordex nicht profitieren wird. Windanlagen dürften in den nächsten Jahren geradezu inhaliert werden! Selbst BP baut massiv Windanlagen auf.

 

10 largest proposed wind farms

The following table lists the ten largest proposed onshore wind farms, by nameplate capacity.

Wind farm↓ Capacity (MW)↓ Country↓ References↓
Clyde Wind Farm548UK[29]
Dobrogea Wind Farm1500Romania[30]
Gansu Wind Farm20000China[31]
Hartland Wind Farm500-1000USA[32]
Markbygden Wind Farm4000 at mostSweden[33]
Pampa Wind Project4000USA[citation needed]
Shepherds Flat Wind Farm845USA[34][35]
Silverton Wind Farm1000 at mostAustralia[36]
Sinus Holding Wind Farm700Romania[citation needed]
Titan Wind Project5050USA[37]
Vlorë Wind Farm500Albania[38]

quelle:Wikipedia

 

6562 Postings, 5798 Tage SemperAugustusNordex produziert ja in China

 
  
    #95
1
01.02.11 12:23

Ich denke bei den ganzen Projekten dort wird man sicherlich auch zum Zuge kommen.

 

Ab 2011 soll eine Jahreskapazität von 800 MW bereit sein!

www.nordex-online.com/index.php

 

Sehr positiv dass Nordex ausgerechnet in den zukünftigen WindBoom-Ländern USA und China produziert.

 

Für mich ist der Kurs massiv unterbewertet!

 

6562 Postings, 5798 Tage SemperAugustusWer 6 sagt muss auch 7 sagen

 
  
    #96
1
01.02.11 14:40

Also wenn wir die 6 Knacken, dann sagt mir der Chart dass gleichzeitig auch die 7 drinne ist, da gibts ja keine Widerstände mehr.

 

 

 

 

1127 Postings, 5088 Tage nobitNordex N90/2500 Offshore

 
  
    #97
01.02.11 16:39

 Schnupper, Schnupper im Offshore-Geschaeft!!!!

  • Wind farm name : Kilbraur (Strathbrora)
  • Country : United-Kingdom
  • County / Zone : Highland
  • Total installed power : 47.5 MW
  • Yearly estimated production : 118 GW.h (for an equivalent of 2500 hours of full load / year)

Details

 

  • Installation : 2008/08
  • 19 turbine(s) Nordex N90/2500 Offshore (puissance de 2500 kW, diamètre de 90 m)
  • Hub height : 70 m
  • Total power : 47500 kW
  • Total wings surface : 82706 m²
  • Operational
  • Developed by : RDC
  • Operator : Falck Renewables
  • Propriétaire : Falck Renewables

http://www.thewindpower.net/wind-turbine-datasheet-13-nordex-n90-2500-offshore.php

 

 

43 Postings, 5074 Tage aktienwahnist doch krass

 
  
    #98
01.02.11 16:46

wie da immer so 20000 zum verkauf drinstehen

kann mir das einer erklären ?

 

217 Postings, 5766 Tage börsipaeher wird hier die 4 fallen ;-)

 
  
    #99
01.02.11 16:52
Das geschäft ist rückläufig, und im letzten jahr war sowieso ne totale windflaute....

Denke das da auf nordex ganz schön viel noch zukommt was den kurs extrem drückt....
Wartungsverträge die total überteuert sind, und vertragsstrafen, weil sie ihre 97% Verfügbarkeit nicht erreichen.....  Das hier ist ein sehr heisses pflaster, und nur was für leute die null ahnung von der windbranche haben.  

6562 Postings, 5798 Tage SemperAugustusDas Geschäft ist nicht rückläufig sondern

 
  
    #100
01.02.11 17:03

Seite: < 1 | 2 | 3 |
| 5 | 6 | 7 | 8 | 9 | ... 15  >  
   Antwort einfügen - nach oben