Suche Kenndaten zu Asiapac


Seite 4 von 5
Neuester Beitrag: 27.02.12 16:49
Eröffnet am:14.01.11 02:14von: farfarawayAnzahl Beiträge:108
Neuester Beitrag:27.02.12 16:49von: MithrandirLeser gesamt:12.179
Forum:Börse Leser heute:4
Bewertet mit:
2


 
Seite: < 1 | 2 | 3 |
| 5 >  

10388 Postings, 5075 Tage farfarawayInfo Asiapac vom 27.1.2011

 
  
    #76
1
04.02.11 05:58

Asiapac scheint zur Zeit aktiver zu werden. Teile in der Homepage sind dazu gekommen und neue Konsultanten wurden eingestellt.

Immer mehr Fake oder nachhaltige Entwicklung der Firma???

(www .asiapaccapital.ca), is pleased to advise that it has retained the services of Alberto P. Morillo and Ramon G. Santos to provide consulting services for its natural resource projects.
 
Alberto P. Morillo
Mr. Morillo will be responsible for corporate relations with the  government and third party companies with whom the Company works. Mr.  Morillo graduated with a B.S. degree in economics from the Philippine  Womens University. His post-graduate studies saw him earn a Masters  degree in strategic management, and culminated in a PhD in Development  Administration. A career in the Philippine Army saw him rise through the  ranks to Brigadier General by the time he retired in 2005. Most  recently, he served as the Undersecretary in a number of government  roles, including the Department of Energy and Department of Environment  and Natural Resources.
 
Ramon G. Santos
Mr. Santos will provide additional geological expertise for the Company.  Mr. Morillo is a trained geologist with a B.S. in Geology from the  University of the Philippines. He also has completed numerous post  graduate courses in business and geology, as well as Management  Development training from the Asian Institute of Management (AIM).
 
He has extensive experience as a geologist and in senior management  roles for a number of resource related companies in the Philippines.  These include; Phillips Petroleum Company in Manila; Philippine National  Oil Company-Exploration Corporation; Basic Petroleum and Minerals Inc.;  Forum Pacific Inc.; and eventually founded First Exploration  Development Services – a natural resource consultancy.

 

10388 Postings, 5075 Tage farfarawayAntwort von Asiapac auf meine Frage wegen Hydro

 
  
    #77
1
04.02.11 11:08

 

Die Hydro Projekte von Asiapac sind die gewinnbringensten auf längere Zeit. Deswegen habe ich eine Frage nach der Durchführbarkeitsstudie gestellt, die eigentlch Ende 2010 ins Netz gestellt werden sollte. Man verspricht, diese nexte Woche zu publizieren, na dann sehen wir mal...schaut so aus, als ob asiapac anspruchsvoller wird...

Comments: Dear Sir,
About your Talubin and Tanudin river projects:
Asiapac announced a more detailed financial analysis, which will be conducted as a part of the feasibility studies. The results were expected to publish the 4th quarter of 2010.
Now it is February 2011.
Sincerely yours

   

hi,
we have alrdy finish the feasibility study of some our hydro projects, we
are posting it up in our website, it should be updated by next week. tks

 

450 Postings, 5066 Tage Mithrandiralso haben wir jetzt

 
  
    #78
04.02.11 11:42
zweimal die Aussage, dass demnächst News kommen werden.
Wenn die sich nicht bald rühren, ist der Kurs wieder bei 0,004 befürchte ich.

Mit  

10388 Postings, 5075 Tage farfarawayNächste Woche bereits laut letzter Aussage

 
  
    #79
04.02.11 16:56

Allerdings muss man die selber in der HP unter den entsprechenden Projekte ausmachen, denke ich. Hoffe mal,

dass das nicht nur Dampfplauderer sind.

 

38 Postings, 5052 Tage pantherfrankfurtist einiges in der spur

 
  
    #80
04.02.11 17:01

laßt uns einfach abwarten was passiert  , aber auf diesem inv. ist unsere asia ne dicke chance

 

38 Postings, 5052 Tage pantherfrankfurtist einiges in der spur

 
  
    #81
1
04.02.11 17:13

laßt uns einfach abwarten was passiert  , aber auf diesem inv. ist unsere asia ne dicke chance

 

10388 Postings, 5075 Tage farfarawaysehe ich auch so

 
  
    #82
1
05.02.11 02:33

mal so paar Wochen abwarten und beobachten, Nachfragen bei Asia können aber nicht schaden

 

10388 Postings, 5075 Tage farfarawayHomepage von asiapac

 
  
    #83
1
06.02.11 05:15

ist zur Zeit nur bedingt zugänglich. Auf einzelne Seiten kommt man zZ nicht. Wahrscheinlich werden diese, wie von Asiapac angesprochen, auf den neuesten Stand gebracht. Innerhalb von wenigen Wochen gibt sich Asiapac offensichtlich insgesamt Investoren freundlicher. 

 

10388 Postings, 5075 Tage farfarawayDie Seite von Asiapac ist wieder ok

 
  
    #84
1
08.02.11 09:02

und der Kurs macht sich. Hoffentlich nachhaltig.

 

2955 Postings, 5526 Tage bindabeizu farfaraway

 
  
    #85
08.02.11 09:08
worauf du dich verlassen kannst  

10388 Postings, 5075 Tage farfarawayhoffentlich

 
  
    #86
1
08.02.11 13:47

wenn der Schein langsamer ansteigt, waers mir auch recht. Zur Zeit fast etwas zu unruhig die Aktie...

 

10388 Postings, 5075 Tage farfarawayBesser als erwartet

 
  
    #87
1
09.02.11 01:53

mit einer grünen Null wäre ich auch zfrieden gewesen...

 

10388 Postings, 5075 Tage farfarawayGratulation an die Bären

 
  
    #88
10.02.11 02:21

aber bei den Umsätzen werden sie bald wieder zu den Verlierern gehören. Wahrscheinlich schon heute!

 

10388 Postings, 5075 Tage farfarawayWie von Asiapac versproche, News in dieser Woche

 
  
    #89
10.02.11 08:59

Habs in der Originalsprache gelassen, denn die Übersetzungen der Maschinen taugen nicht viel bei technischen Berichten.


Viel Glück heute- allen Investierten

Capital Reveals Plans for Siffu River Mini Hydro Project

 

 

 

Toronto, Canada – (For immediate release)

AsiaPac Capital Services Ltd.: Deutsche Börse symbol: 5AP. (www .asiapaccapital.ca), wholly owned subsidiary; Asiapac Green Renewable Energy Corp.; announced today the results of the technical findings and plans for its Siffu River mini-hydro project located in the municipality of Natonin, Mountain Province in the Phillippines.

 

With the completion of the feasibility studies, the Company now plans to install a 2.75 MW mini-hydro station. Plans call for the installation of two 1,200KW and one 350 KW reaction type turbines with a gross head of 51.23 m., 42 m. net head, and design flow of 8.35 cms for the three units.

 

The weir height will be 10 meters high. The gravity flow headrace line will be 2,760 m. long and is envisioned as a rectangular type reinforced concrete barrel style with inside dimension of 2.40 m x 1.70 m. and exterior dimension of 2.80 m x 2.10 m.

 

The surge tank is planned as a circular steel tank having inside diameter of 6.50 m with a height of 14 m. with a reinforced concrete ring foundation.

 

A steel penstock having an inside diameter of 1.30 m. will feed in to the powerhouse. An outdoor substation adjacent to the powerhouse will house a step-up generator to increase voltage from 6.9 KV to 69 KV.

 

Plans also call for a 5.5 km. all-weather access road to the plant site.

 

Total project cost is estimated at USD $9.3 million, at an average cost of USD $3.4 million per MW capacity.

 

Annual energy production is estimated at 9.63 Gw-hrs at a plant factor of 40.00%.

 

 

 

 

 

10388 Postings, 5075 Tage farfarawayWieder

 
  
    #90
13.02.11 14:26

Einstiegskurse? Oder hat sich fundamental was verändert!!!

 

10388 Postings, 5075 Tage farfarawayDer Kurs schläft ein!

 
  
    #91
19.02.11 03:16

An was liegt das?

Irgendwie kommt das Geschäftsmodell beim Kunden nicht gut genug an. Mich stört lediglich SRL, eine Firma, deren Homepage auch an die von asiapac angebunden ist und ebenfalls Minikraftwerkprojekte in den Philippinen hat. Sitz auch in Kanada, Wert auch in Dtl registrigiert (seit 9-2010). Die Firma hat zwei Projekte dort, die ähnliche Standorte wie die von asiapac aufweisen. (Schnittmengen gibt es nur in diesem Bereich mit asiapac, alle anderen von asiapac sind davon nicht berührt, soweit bekannt).

Ambugao Project (das ist am Siffu River). Location: Paracelis, Mt. Province, Mountain Province, Philippines.

Caneo Project (das ist am Talubin River). Location: Caneo, Bontoc, Mountain Province, Philippines.
This project has a preliminary calculated power capacity of 3 MW.

Die angegebenen Koordinaten auf den Karten sind aber unterschiedlich.

Die Aktie wird in Frankfurt kaum gehandelt, in einem Thread sind die notwendigen Infos zu finden. Southeast Asia Renewable Power-Chance oder Abzocke. Bemerkenswert: srl hat im letzten Jahr eine agressive Telefonwerbung in Dtl durchgezogen. Der Wert stand mal bei 1.75 und ist jetzt unter 0.20 cent. Es könnte durchaus sein, dass srl auf den Zug von asiapac aufgesprungen ist. Der CEO ist Mr Tan, ein Philippine. Warum asiapac deren Homepage mit seiner verknüpft (en lässt), verstehe ich nicht.

Werde gelegentlich bei asiapac anfragen, inwieweit deren Aktivitäten mit srl koordiniert sind und wie weit die Zusammenarbeit geht.

Kurze Hinweise zur Firma:

Southeast Asia Renewable Power Co. Ltd. is a Canadian based company  active in the field of renewable energy.  The company conducts  operations through its wholly owned subsidiary of the same name in the  Philippines, and is actively involved in developing “Run of River”  mini-hydro power stations.

South East Asia Renewable Power Co. Ltd.: Deutsche Börse symbol: SRL  (www.southeastrenewable.com), announced today that it is now listed on  the Frankfurt Exchange under the ticker symbol: SRL.

 

276 Postings, 5118 Tage davidezignnun gut!

 
  
    #92
1
19.02.11 10:27

jetzt laßt uns kommende woche das ding mal hochschaukeln und so!

alles ist möglich, nichts ist wahr!

somit können wir auch wir hier höchststände sehen! salute...

und glück auf!
 

 

6200 Postings, 5825 Tage bernd238"alles ist möglich, nichts ist wahr!

 
  
    #93
19.02.11 21:12
Sehr gut erkannt:"alles ist möglich, nichts ist wahr!

Hier ist alles möglich, aber hier ist auch alles gelogen.

Mal sehen welche Seite nächste Woche stärker ist! ?  

10388 Postings, 5075 Tage farfarawaydie Projekte gibt es schon,

 
  
    #94
20.02.11 05:08

nur werden die zukünftigen Gewinne auch den Investoren zu Gute kommen???

Ownership der Projekte!

Bei Asiapac ist viel möglich, siehe zB auch Erze wie Gold etc, die mal abgebaut werden sollen.

Er wird schon werden...

 

971 Postings, 5062 Tage kuchenuwedas glaube ich auch

 
  
    #95
20.02.11 16:33
immer mit der ruhe, abwarten  

5876 Postings, 5339 Tage lamaromacht ihr euch da nicht was

 
  
    #96
20.02.11 20:23

ins Hemd?

 

Optionen

10388 Postings, 5075 Tage farfaraway@lamaro

 
  
    #97
25.02.11 10:30

die MK ist so gering. Da seh ich kaum Gefahr, das da was in die Hose geht.

 

110 Postings, 4997 Tage eZoomeine Freunde zieht euch warm an jetzt hab ich

 
  
    #98
3
08.04.11 15:24
was gefunden da verschlägt es euch die Sprache!!! Dachte mir schon dass die zusammen gehören... ich stells gleich rein :-)  

Optionen

465 Postings, 5455 Tage wiconeZoo

 
  
    #99
08.04.11 15:39
nun leg los  

Optionen

5876 Postings, 5339 Tage lamarobitte sag nicht

 
  
    #100
1
08.04.11 15:40

gadafhi und asiapac

oder asiapac und merkel    hahahahahaha    ein kleine joke am rande

 

Optionen

Seite: < 1 | 2 | 3 |
| 5 >  
   Antwort einfügen - nach oben