Die besten Edelmetallaktien fürs Depot
Seite 18 von 36 Neuester Beitrag: 24.04.21 23:07 | ||||
Eröffnet am: | 30.04.11 16:23 | von: DasMünz | Anzahl Beiträge: | 886 |
Neuester Beitrag: | 24.04.21 23:07 | von: Christinxsxa. | Leser gesamt: | 213.723 |
Forum: | Hot-Stocks | Leser heute: | 7 | |
Bewertet mit: | ||||
Seite: < 1 | ... | 15 | 16 | 17 | | 19 | 20 | 21 | ... 36 > |
ABOUT THE KING-KING PROJECT
King-king is one of the largest undeveloped copper-gold deposits in the world. As released in the October 2010 Technical Report and the updated resource report released August 15, 2011, Measured and Indicated mineral resources are 962.3 million tonnes at 0.254% total copper, 0.062% soluble copper, and 0.334 grams per tonne ("g/t") gold. Inferred mineral resources are an additional 188.8 million tonnes at 0.215% total copper, 0.048% soluble copper, and 0.265 g/t gold. The Measured and Indicated mineral resource consists of 5.4 billion pounds of contained copper and 10.3 million troy ounces of contained gold.
http://www.stockhouse.com/companies/overview/...ay%20resources%20ltd.
http://www.stockhouse.com/companies/overview/...prodigy%20gold%20inc.
Stellt sich nun die wär die nächsten sind.
GCU vielleicht
http://www.stockhouse.com/companies/overview/...on%20resources%20inc.
oder PMV
http://tmx.quotemedia.com/...=CDX&qm_page=31227&qm_symbol=PMV
oder im Silber Sektor WS & MND, (AUN)- sonst sehe bei einigermaßen reinen Projekten in sicheren Ländern wenig Möglichkeiten.
http://tmx.quotemedia.com/quote.php?qm_symbol=MND
http://www.stockhouse.com/companies/overview/t.ws/...er%20corporation
intercept of 10.03 metres at 2,591 grams per tonne including 1 metre at 19,800g/t – or the equivalent of 1.98% silver- gut aber der Kurs bewegt sich nicht
http://www.proactiveinvestors.com.au/companies/...-silver--34766.html
http://www.proactiveinvestors.com.au/companies/...eflector-34754.html
NML bohrt wieder - und trifft auf Gold
1.5m @ 59.2g Au/t
4.5m @ 23.1g Au/t
38 m at 20.8 g/t gold and 57 g/t silver at Mt Kare +14%
Gold/Silver Project, PNG
http://stocknessmonster.com/news-history?S=IDC&E=ASX
Nimbus Super High Grade Zones Confirmed & Extended in Core +11%
http://stocknessmonster.com/news-history?S=MRP&E=ASX
holt sich 20M AUD für ein 217000m Bohrprogramm und die Machbarkeitsstudie
http://stocknessmonster.com/stock-quote?S=PXG&E=ASX
The Curral de Pedra Project is located near Troy Resources (ASX: TRY) Sertão gold mine in central Brazil
Curral de Pedra is an advanced, drill‐ready gold project with numerous historic
workings.
http://stocknessmonster.com/news-item?S=EXG&E=ASX&N=609162
http://www.stockhouse.com/financialtools/...view.aspx?qm_symbol=V.RMC
http://www.stockhouse.com/companies/overview/...ndstorm%20gold%20ltd.
http://www.stockhouse.com/companies/overview/...20gold%20mines%20inc.
09:07 30.10.12
Mawson erhält Stichproben mit bis zu 2.817 g/t Gold bei Rajapalot (Finnland)
Vancouver, Kanada Mawson Resources Limited (Mawson) (TSX MAW; Frankfurt MXR, PINKSHEETS- MWSNF) hat beim Schürfgebiet Rajapalot in Finnland im Rahmen von Schürfarbeiten in Stichproben überaus hohe Goldgehalte (Bonanza-Gehalte) von bis zu 2.817 g/t Gold in 3 Gebieten, die einige Kilometer voneinander entfernt sind, entdeckt. Rajapalot liegt 8 Kilometer im Osten vom Goldprojekt Rompas im Norden Finnlands (Abbildung 1).
Zu den Höhepunkten dieser Arbeiten gehören:
•§Stichproben, die bei Ausbissen und Findlingen entnommen wurden, ergaben, neben dem Auffinden von 36 weiteren Stichproben, 2.817 g/t Gold, 2.196 g/t Gold, 1.245 g/t Gold, 933 g/t Gold, 151 g/t Gold und 135,5 g/t Gold (siehe Tabelle 2 zur Ansicht der vollständigen Ergebnisse);
•§Die 52 Proben, die bislang beim Schürfgebiet Rajapalot entnommen wurden, ergaben durchschnittlich 152,8 g/t Gold und reichen von 0,001 g/t bis 2.817 g/t Gold (siehe Tabelle 1 und 2);
Herr Hudson erklärte: Die zweite Runde an Schürfergebnissen von Rajapalot belegt die Größenordnung, das Potenzial und die extrem hohen Goldgehalte im Gebiet Rompas-Rajapalot. Nichtsdestotrotz ist der Zusammenhang dieser neuen Entdeckung mit dem größeren Projektgebiet Rompas-Rajapalot von größerem Interesse. Wir verfügen in dieser frühen Phase der Exploration nun über Hinweise auf ein Mineralsystem, bei dem sich in einem Gebiet von nahezu 10 x 10 Kilometern hochhaltige Goldmineralisierung abgelagert hat. Dies ist auf globaler Ebene bedeutend. Das Unternehmen hat den Schürfungen im Gebiet Rajapalot Vorrang eingeräumt und die Ergebnisse vieler geochemischer Proben stehen noch aus. Während des 1. Quartals 2013 werden mit dem Ziel, Bohrziele abzugrenzen, die im 1. und 2. Quartal 2013 untersucht werden können, geophysikalische Flug- und Bodenvermessungen durchgeführt werden.
...
http://www.ariva.de/news/...7-g-t-Gold-bei-Rajapalot-Finnland-4317958
http://stocknessmonster.com/news-history?S=OGX&E=ASX
Breakthrough results reveal
strong potential for next Paulsens
http://stocknessmonster.com/news-item?S=NST&E=ASX&N=612139
Jüngestes Update, November 2012: Update, November 2012: https://d1ky22hjsenqhd.cloudfront.net/assets/...UG50_110512.pdf
http://www.stockhouse.com/companies/overview/v.bbb
http://www.stockhouse.com/companies/stories/t.p/8640318
Primero Announces Expansion of Its San Dimas Mine
TORONTO, ONTARIO--(Marketwire - Oct. 15, 2012) -
(Please note that all dollar amounts in this news release are expressed in U.S. dollars unless otherwise indicated.)
Primero Mining Corp. ("Primero" or the "Company") (TSX:P)(NYSE:PPP) today announced a mine and mill expansion of its San Dimas gold-silver mine in Mexico. The Company has elected a staged approach to the full expansion and has approved the expenditure of a total $14.4 million to expand the San Dimas mine and mill to 912,500 tonnes per year ("TPY") or 2,500 tonnes per day ("TPD"). Construction of the mine and mill expansion will begin immediately, with an estimated completion during the first quarter of 2014.
Highlights:
Attractive Economics: 150% after-tax IRR1 and a payback period of less than 24 months;
Increases Production: Approximately 160,000 gold equivalent ounces2,3 average annual production over the next five years;
Reduces Cash Costs: Primero Announces Expansion of Its San Dimas Mine
Primero Announces Expansion of Its San Dimas Mine
TORONTO, ONTARIO--(Marketwire - Oct. 15, 2012) -
(Please note that all dollar amounts in this news release are expressed in U.S. dollars unless otherwise indicated.)
Primero Mining Corp. ("Primero" or the "Company") (TSX:P)(NYSE:PPP) today announced a mine and mill expansion of its San Dimas gold-silver mine in Mexico. The Company has elected a staged approach to the full expansion and has approved the expenditure of a total $14.4 million to expand the San Dimas mine and mill to 912,500 tonnes per year ("TPY") or 2,500 tonnes per day ("TPD"). Construction of the mine and mill expansion will begin immediately, with an estimated completion during the first quarter of 2014.
Highlights:
Attractive Economics: 150% after-tax IRR1 and a payback period of less than 24 months;
Increases Production: Approximately 160,000 gold equivalent ounces2,3 average annual production over the next five years;
Reduces Cash Costs: Cash costs4 drop by roughly $110 per ounce from current levels to approximately $510 per gold equivalent ounce, or $200 per gold ounce on a by-product basis, average over the next five years;
Low Capital Cost: Estimated $14.4 million for the mine and mill expansion;
Further Expansion Possible: Ongoing assessment to consider ultimate mill expansion to 3,000 TPD.
"We are pleased to announce our plans to expand our San Dimas mine, the after-tax internal rate of return is 150%, which will generate a significant value increase for Primero shareholders." said Joseph F. Conway, President and Chief Executive Officer. "The staged implementation of the project also de-risks the capital expenditures, as the optimization project to fill the current plant capacity of 2,150 tonnes per day is scheduled to be completed by the end of the first quarter of 2013. The expansion to 2,500 tonnes per day is expected to be completed by no later than the end of the first quarter of 2014.
The Company remains focused on expanding production at San Dimas with a target of ultimately producing at a rate of 200,000 gold equivalent ounces per year. A further plant expansion to 3,000 tonnes per day continues to be assessed and is dependent on future exploration success, with detailed engineering expected to be completed before the end of 2013. With continued positive exploration results, we remain confident that San Dimas has the potential to produce at our targeted rate of 200,000 gold equivalent ounces per year in the near future."
Staged Implementation: Optimization to Achieve Current Capacity of 2,150 TPD , or $200 per gold ounce on a by-product basis, average over the next five years;
Low Capital Cost: Estimated $14.4 million for the mine and mill expansion;
Further Expansion Possible: Ongoing assessment to consider ultimate mill expansion to 3,000 TPD.
"We are pleased to announce our plans to expand our San Dimas mine, the after-tax internal rate of return is 150%, which will generate a significant value increase for Primero shareholders." said Joseph F. Conway, President and Chief Executive Officer. "The staged implementation of the project also de-risks the capital expenditures, as the optimization project to fill the current plant capacity of 2,150 tonnes per day is scheduled to be completed by the end of the first quarter of 2013. The expansion to 2,500 tonnes per day is expected to be completed by no later than the end of the first quarter of 2014.
The Company remains focused on expanding production at San Dimas with a target of ultimately producing at a rate of 200,000 gold equivalent ounces per year. A further plant expansion to 3,000 tonnes per day continues to be assessed and is dependent on future exploration success, with detailed engineering expected to be completed before the end of 2013. With continued positive exploration results, we remain confident that San Dimas has the potential to produce at our targeted rate of 200,000 gold equivalent ounces per year in the near future."
Staged Implementation: Optimization to Achieve Current Capacity of 2,150 TPD
Guerrero Gold Belt - Mexikos angesagter Gold-Bezirk
Die Edelmetallindustrie in Mexiko bleibt im Hausse-Modus. Der Minenausstoß der Gold- und Silberproduzenten steigt seit vielen Jahren an und wird auch dieses Jahr voraussichtlich neue Rekorde erreichen. Parallel fließen auch Rekordsummen in den angeschlagenen Explorationssektor. Die großen Produzenten der Branche sehen sich derweil nach weiteren Übernahmeobjekten um. Die Aktivitäten in einem aufstrebenden Gold-Bezirk namens Guerrero Gold Belt werden dabei genau verfolgt. Der im Süden von Mexiko lokalisierte Bezirk hat etliche weltklasse Entdeckungen im Goldsegment in den letzten Jahren hervorgebracht..
http://www.rohstoff-investingnews.de/gold/guerrero-gold-belt/
Glänzende Zukunftsaussichten für Formation Metals
Formation Metals wird bald hochreines Kobalt aus Idaho liefern können. Das Unternehmen ist weiter auf dem besten Weg zum Erfolg. Die Aktie des Unternehmens könnte deutlich zulegen, nachdem sich Dundee eingekauft hat..
http://www.rohstoff-investingnews.de/kobalt/...chten-formation/
Continental Gold Drills 65 metres @ 10.4 g/t Gold and 9 g/t Silver in a Deep Step-Out Hole in Western Yaraguá at Buriticá, Colombia
Toronto, Ontario, November 12, 2012 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the "Company") is pleased to announce results for 14 diamond drill-holes and also underground channel sampling from the Yaraguá vein system (“Yaraguá”) at the Buriticá project in Antioquia, Colombia. Seven drills are currently on site as part of the Company’s Phase IV, minimum 100,000-metre diamond drill program for 2012-2013..
http://www.continentalgold.com/_resources/news/nr_2012_11_12.pdf
einer der ganz rar gesääten Highgradevorkommen- ähnlich wie newstrike capital- aber günstiger bewertet.
NQ+8% bei einem wirklich schwachen Umfeld ( GDXJ -4% )
http://www.stockhouse.com/companies/overview/v.nq/northquest-ltd.
Brixton sollte man eigentlich kaufen- denen gehört leider nur 51% am Projekt
Brixton expands The Oban Breccia Zone, cutting one of the widest high grade sections to date: 150.50m of 314.59g/t AgEq including 73.70m of 466.28g/t AgEq
Brixton Metals Drills 83.9m of 296.50 g/t AgEq including 12.9m of 769.42 g/t AgEq
http://www.stockhouse.com/companies/overview/v.bbb
Kiska may elect to form a Joint Venture with Brixton at the 49/51 or 35/65 stage, or take dilution where Brixton may increase its ownership. Brixton shall be the operator in either case.