Wie der Investorenverlag qualitativ einzuordnen ist, kann ich Dir nicht sagen, damit habe ich mich überhaupt nicht befasst. Wären die grossen Buchstaben garant für Seriösität, wären sie die besten.
Gruss
ptm
Grummel...
Shares Outstanding: 65 million shares
Fully Diluted: 71 million
Market Cap: $44 million
Cash on Hand: $4 million
MFg
chali
Press Release
Source: Geodex Minerals Ltd.
On Monday March 2, 2009, 9:30 am ES
The last document on the economic status of the Sisson Brook tungsten-molybdenum deposit north of Fredericton, New Brunswick was a Preliminary Economic Assessment carried out by Wardrop Engineering in November 2007. A robust NPV and IRR led to the recommendation that work proceed to the next development stage. Infill drilling, geotechnical work and environmental/community studies took place in 2008 and have continued since that time.
The present study remains at the scoping study (Preliminary Economic Assessment) level but is based largely on new data, particularly an expanded block model which has recently undergone preliminary floating cone pit shells with grade scheduling and a program of metallurgical work at SGS in Vancouver. Preliminary ore-sorting testing and the subsequent preliminary process design indicate that a pre-concentration circuit would profoundly benefit operating and capital costs. These further indicate that the ore-sorting process following three-stage crushing could concentrate 96.0% of the tungsten and 83.8% of the molybdenum in slightly more than half of the feed material, which increases grade to the mill and reduces capital and operating costs. A plant layout and process equipment list was developed and costed by an independent engineering group to reflect this revised concept.
The report spreadsheet uses a mining and crushing rate of 20,000 tonnes/day over a mine life of 20 years. Overall recoveries (sorter and mill) are 74% for tungsten and 70% for molybdenum. Tungsten is priced at an APT price of $US 220/mtu of WO3 in concentrate, with a blended $US 50/tonne reduction (gravity/flotation) for offsite costs. Molybdenum uses a long term price of $US 15/lb with an 8% assessment for offsite costs and roasting. Mine Operating Costs remain at $Can 1.30/tonne ($US 1.11), beneficiation costs are re-assessed at $Can 4.66/tonne ($US 3.96) with G &A costs at $Can 0.66/tonne ($US 0.56).
The re-calculated pre-production Capital Costs from the new process concept are slightly reduced at $US 339 million which includes a 30% contingency. Owner's costs include $US 1.0 million for environmental costs during construction. Sustaining (and sinking fund provision for reclamation) costs are assessed at 2.5% of original capital per production year.
Spreadsheet analysis indicates that the project has an Unleveraged IRR from Year -2 of 23%. The pre-tax NPV at an 8% discount rate is $US 372 million, $US 277 million at 10%. Payback period is in Year 4. Cumulative cash flow is $US 1.18 billion.
It has long been recognized that New Brunswick offers a mining-friendly environment, good access and excellent infrastructure. The economics of open pit development linked to the large size of the deposit suggest that much flexibility will exist in mine planning to react to changes in metal prices by extending mine life or increasing daily volume.
The recommendation within this report is that the company moves to completion of a Pre-Feasibility study by Q4 2009. The present report is a 'baseline' study or directional concept produced in a worldwide trough of mining finance. It requires refinement and upgrading in several areas to bring it to the stage of a commercial concept
MFG
Chali
Primary goal is resource upgrade for prefeasibility study at Sisson Brook Tungsten-Molybdenum Deposit in New Brunswick
Press Release
Source: Geodex Minerals Ltd.
On Tuesday July 21, 2009, 11:39 am EDT
Geodex Minerals Ltd. (TSX-V:GXM - News)(Frankfurt:G2W - News) (the "Company") is pleased to announce that the 2009 drill program at the Sisson Brook tungsten-molybdenum deposit, located north of Fredericton, New Brunswick has been completed ahead of schedule. The drilling program consisted of 4,900 metres in 28 holes. This drill program was one of a series of drill programs from 2005 to 2009 that have successively advanced Sisson Brook from exploration to the prefeasibility and development phase.
The drilling portion of the program was completed ahead of schedule and within budget. Core logging and assay analysis of the core are continuing. The assay results will be available by early October for incorporation into an updated resource tonnage block model that is planned to follow immediately thereafter.
The goal of the drill program was three fold. The main purpose was to upgrade a portion of the current Inferred resource to the Measured and Indicated category for inclusion in the prefeasibility study in the Company's development plan. Secondly, identify better grade near surface resources which will be mined early in the life of the mine to improve the recovery of mine capital costs. Drilling was also completed for targets adjacent to the Zone III and Ellipse Zones, the two most economically important zones in the Sisson Brook deposit.
Geodex completed an encouraging preliminary economic study earlier this year that demonstrated the Sisson Brook deposit is a large tungsten-molybdenum resource amenable to low-cost open-pit mining methods. A prefeasibility study is the next stage and will consist of updating the resource calculation based on the current drill program, advancing the metallurgical work that has successfully identified an effective pre-concentration process, as well as advancing the mine design, engineering, infrastructure and ongoing environmental studies.
About Sisson Brook
Sisson Brook is Geodex's flagship property and is located in an area with excellent logistics and infrastructure for mine development. A skilled labour force combined with ready access to power, roads, railway, a deep water port and a good geographic location in a secure jurisdiction all position the project well to continue to advance in a timely fashion. A preliminary economic assessment report (Geodex News Release of March 2, 2009) outlines the potential for developing a mine which could become one of the Western world's largest tungsten producers, as well as a significant producer of molybdenum. Both metals are fundamentally important for steel production and infrastructure development.
Jack Marr, MSc, PGeo, is the in-house qualified person for this project.
On Behalf of the Board of Directors
GEODEX MINERALS LTD.
Mark Fields, President & CEO
Talking Tungsten .com
Geodex Minerals puts plans on hold due to lack of funding
By CHRIS FOX
Daily Gleaner
A major step towards construction of a US$339-million open-pit tungsten mine near Stanley is on hold while officials search for funding.
Vancouver's Geodex Mining Ltd. completed a metallurgic assessment at a site in Sisson Brook in April. It showed rich deposits of tungsten and molybdenum valued at US$1.18 billion over an expected 20-year mine life. Exploratory drilling began June 11.
The next step will be a pre-feasibility study, expected to take six to eight months, but Mark Fields, president and CEO of Geodex Mining, said Thursday that securing funding for the $1.3-million study has been a challenge, leaving the project temporarily stalled.
"The sooner we can start the better, but in the summertime it is always more difficult to get the financing in place for something like that," he said.
"We are having some discussions and the sooner we can start the happier we will be, but we don't have any firm timeline right now."
While a 26-hole drilling project at the site now is meant to give officials from Geodex a clearer picture of the grade and quantity of tungsten at the site, the per-feasibility study will explore how to extract the tungsten and gauge the capital and labour costs that will be incurred in doing so. It will also make preliminary recommendation on how to lay out and design the mine.
"What we are trying to do is advance the confidence level of the work that has been done from broader parameters to more detailed study, and what we would like to be doing as we do the pre-feasibility study is have some discussions with parties in the Tungsten industry," said Fields.
"One of the advantages of the Sisson Brook deposit is that it is so large that it could become quite the player on the world stage, so we want to have increasing contact with the people that actually use the tungsten."
Tungsten is a steel-grey metal often used in construction. About 85 per cent of the world's tungsten supply comes from China, but there are also large stores in Austria, Bolivia, Portugal and Russia. In Canada, it is mined only in the Northwest Territories.
Stanley Mayor Richard Storey said he's excited for the impact a major mine in nearby Sisson Brook will have on his town.
"They are not ready with their feasibility study yet, but we are hoping it is going to go forward soon," he said.
"The majority of people in town are for it as long as the environmental studies are done according to the government. So we're kind of looking forward to it."
The Village of Stanley will release a third-party study on the economic impact of the Sisson Brook mine in September.
Fields said he's excited by the mine's money-making potential, adding that a delay of several months in moving on to the pre-feasibility study stage shouldn't have much of an impact on his plan to have the mine in operation by 2013.
"The worldwide economy is a big variable right now, but if things go ahead, we will certainly see the mine in operation by 2013 or 2014," he said.
"Sisson Brook is very well located and all the infrastructure is there in terms of roads, railway and labour force, and that is important because this is a worldwide market and we will be accessing the North American market, the Asian market and the European market."
Wenn die Pre-Feasibility-Studie nicht bald mal kommt - und momentan sieht es nach Verzögerung aus; sie war darüber hinaus ja eigentlich auch mal bis April 2009 angekündigt -, sehe ich für den Kursverlauf momentan schwarz. Allerdings kann ich mir andererseits auch nicht vorstellen, dass Geodex Liegenschaften einfach so in der Versenkung verschwinden, denn dafür sind sie einfach zu wertvoll. Ich spekuliere auf Verhandlungen mit potenziellen Investoren, die eventuell im Hintergrund bereits laufen. Bei dem derzeitigen Kurs scheiden jedenfalls Kapitalerhöhungen zur Finanzierung der Vormachbarkeitsstudie nahezu aus.
Selbst wenn die Studie finanziert werden kann, stellt sich natürlich die Frage, wie Geodex Kapital in Höhe von 300-400 Mio $ aufbringen soll. Das geht nur über institutionelle Investoren. Banken scheiden eventuell schon aufgrund der derzeitigen Finanzkrise als Geldgeber aus. Andererseits ist Geodex in New Brunswick bereits gut vernetzt und die Kommunen würden zahlreiche neue Minenjobs in der Region sicherlich gerne sehen. Vielleicht ist für Geodex ja eine Hilfe aus den kanadischen Konjunkturprogrammen drin. Alles natürlich Spekulation. Aber für Geodex gilt momentan: Kapital muss her, koste es, was es wolle.
Fegefeuer
MFG
Chali
Fegefeuer
MFG
Chali
http://www.spiegel.de/wirtschaft/unternehmen/0,1518,647681,00.html
Fegefeuer
Fegefeuer
WKN: 865732
ISIN: CA3719371039
Symbol: GXMLF
Canada
Wolfram mit 177Mio Tonnen eine der größten Minen der Welt
100.3 million shares, 127.9 Mio full diluted
cash 1Mio$
Produktion ab 2012
vorläufige Machbarkeit Q1-Q2 2010, vorläufige Wirtschaftlichkeitsstudie erstellt 03.2009
http://www.geodexminerals.com/s/Home.asp
http://www.geodexminerals.com/s/Tungsten.asp
http://www.ariva.de/news/...Geodex-Minerals-Geodex-Minerals-2-3162859
http://www.irw-press.com/dokumente/GeodexTabelle171209.pdf
http://www.spiegel.de/wirtschaft/unternehmen/0,1518,647681,00.html
www.irw-press.com/dokumente/October-27-2009-News-Release_DEUTSCH.pdf
Ich habe einen thread zu Explorern eröffnet:
http://www.ariva.de/forum/Explorer-timeline-jumping-408583
Mich würde eure Meinung dazu sehr interessieren?
Gruß
================================================== =====================
Geodex Minerals Ltd (TSX-V: GXM), (das "Unternehmen" oder "Geodex ') ist
freut sich, dass in einer zweiten Phase auf den metallurgischen Programms ankündigen
Wolfram-Molybdän-Lagerstätte Sisson Brook in New Brunswick liegt
im Gange. Die bisherigen metallurgischen Programms zeigten attraktiven Metall-Rückforderungen und, ganz wichtig, eine positive Antwort auf Pre-Konzentration. Das vorliegende Programm baut auf diesen Prozess zur weiteren Verbesserung der Profitabilität Bergwerk angezeigt durch die Preliminary Economic Study ("PEA", siehe Pressemitteilung 2. März 2009) durch kontinuierliche Verbesserungen der Metall-grade in der Mühle.
Dieses Programm soll den bisherigen Test geleistete Arbeit ergänzen auf ein Composite hergestellt aus repräsentativen Bohrproben. Die Ergebnisse aus dieser Ebene vorbereitende Testprogramm an, daß beide Wolfram und Molybdän in ihre jeweiligen verarbeitet werden konnte konzentriert sich auf attraktive Typen. Das Hauptziel des aktuellen Testprogramms ist pre-Konzentration Techniken entwickeln, um die weitere Verbesserung der Noten in der Mühle vor kostenintensive Prozessschritte wie Schleifen und Flotation. Dies wird durch zwei getrennte Tests Prozesse durchgeführt werden. Man wird gut etabliert Verwendung Schwere Trennung Verfahren und Ausrüstungen, einschließlich Zentrifugalkraft die Schwerkraft Konzentration, schweres Papier, Schablonen und Spiralen. Der zweite Test-Prozess verwenden Erz Sortiermaschinen, die zunehmend mit gutem Erfolg in verschiedenen Bergwerken eingesetzt.
Die Vorteile sind die Verringerung der Vorschubgeschwindigkeit bei der Anlage bei gleichzeitiger Erhöhung feed grade in diesem "Pre-Konzentrat" stream. Erfolgreiche Ergebnisse hätte folgende direkte Vorteile:
* Weitere Verbesserung der Gesamtleistung der Wirtschaftlichkeit des Projekts durch niedrigere Kapital-und Betriebskosten durch die Reduzierung der Menge an Material in den späteren Stadien Fräsen bearbeitet;
* Neben einer Verbesserung im Endprodukt Qualitäten möchte weitere Steigerung der Attraktivität des endgültigen konzentriert, um potenzielle Kunden und strategischen Partnern.
Diese zusätzliche metallurgische Arbeit ist der nächste wichtige Schritt bei der Bewertung der Sisson Brook Lagerstätte, die Geodex erfolgreich durch die Erforschung der Bühne hat sich in der Entwicklung und wirtschaftliche Studie Phasen verschoben. Die Ergebnisse sind im dritten Quartal erwartet.
Geodex hat mit Bolu Consulting Engineering ("Bolu") beauftragt, diese metallurgischen Arbeiten zu überwachen. Bolu ist eine renommierte Firma mit langjähriger Erfahrung in der Arbeit auf Wolfram-Projekte auf der ganzen Welt und Regisseur des erfolgreichen bisherigen metallurgischen Arbeiten an Sisson Brook im Jahr 2008 und 2009 durchgeführt.
Die bisherige Arbeit und metallurgischen PEA projiziert die Verwertung von 74% WO3 und 70% Molybdän. Die PEA nachgewiesen attraktive Vorsteuerergebnis wirtschaftliche Erträge der IRR von 23%, NPV (8%) von US $ 372M und einer Amortisationszeit von weniger als vier Jahren. Die Base-Case verwendet ein 20.000 Tonnen pro Tag Durchsatz und Metallpreise von US $ 220 pro metrische Tonne WO3 Einheit (ca. 10 US $ pro Pfund) und US $ 15 pro Pfund Molybdän. Die PEA demonstriert eine attraktive base case und eine Reihe von Alternativen zur Verfügung für weitere Verbesserungen, darunter:
* Reduzieren low grade Feed Mill;
* Erhöhung der Einziehungen;
* Change Bergbau abstimmen;
* Konstruieren Ammonium Para Wolframat (APT), eine Pflanze Wolframpulver produzieren.
David Martin, B.Sc., P. Geo., CGA, wird Geodex Vice President, New Brunswick, einer qualifizierten Person gemäß NI 43-101 und ist verantwortlich für die Konzeption und Durchführung der Programme durchgeführt von der Gesellschaft auf dem Sisson Brook-Projekt. Jack Marr, MSc, PGeo., Vice President Exploration, ist eine qualifizierte Person gemäß NI 43-101 und ist verantwortlich für die Gestaltung und die Inhalte der aktualisierten vorläufigen Economic Assessment Report durchgeführt von der Gesellschaft auf dem Projekt Sisson Brook.
IM NAMEN DES BOARD OF DIRECTORS
Geodex Minerals Ltd.
Mark Fields,
President & CEO
Für weitere Informationen kontaktieren Sie bitte Investor Relations:
Mr. Erick Bertsch
bertsch@geodexminerals.com
(604) 689-7771, Gebührenfrei 1-888-999-3500
Besuchen Sie unsere Website unter www.geodexminerals.com
übersetzt von Google
Die Umsätzein Frankfurt, Stuttgard, München usw. sind = o bei einem Kurswert von 0,05 bei einem hohen Spread. Aber mann bekommt zZ keine Aktie unter 0,065. Aber in Kanada geht es momentan bei kleinen Umsätzen gut ab!... Komisch.
Meine These: Ein oder Zwei Mitarbeiter von Geodex spüren das es aufwärts geht, vielleicht war so'n Schlitzer da, der mal so bereit ist 80 Mio Kanada$ zu investieren... ich weiß es nicht, hab da aber so'n GEFÜHL! Wenn da einer der die letzten Jahre Löcher bohrt mit 3000 $ zockt, dann ist das viel Geld für einen kleinen Mann!
Tungsten auf deutsch Wolfram.
Wird verwendet in der Glühbirne (Wolframdraht) schmilzt nicht bei ultrahohen Temperaturen.
Militär: Panzerdurchbrechende Munition (Wolfram-carbid Ummantelung)
Gewicht: So schwer wie Gold
Farbe: Silber.
hab 'ne Uhr aus dem Zeug, und die kann man bei bestem Willen nicht zerkratzen.
Uhren/Schmuck: Die Firma Rado hatte vor ca. 10 Jahren die Produktion von der legendären Jubilee abgebrochen, Die Uhr kostete damals und heute noch ein Vermögen!
Weil der Herstellungspreis dieser Uhr zu teuer war. Die Uhr war und ist aus Wolfram und man hatte damals noch nicht die Technik und das Know How HÄRTE 9,6 (10,0 = Diamant) zu bearbeiten! Die haben die mit Diamant geschliffen. Man bekomm heute Schweizer Wolfram-Uhren aus China (Yves Camani.. usw mit chinesischem Schweizer Ronda-Werk "swissPart" für ca 129,-€)
Geodex will den Rohstoff vor Ort zermahlen und fertig ind die USA, China usw zu exportieren um hoheTransportkosten zu senken.
Wolframpulver mit Kohlentoff lässt sich wunderbar schmelzen und in Formen giessen.
Ca. 7 Mio. Can-$ MK - viel, wenig, angemessen? Traut sich da jemand ne Einschätzung zu?
MFg
Chali