Thompson Creek Metals
Seite 36 von 345 Neuester Beitrag: 02.02.08 18:40 | ||||
Eröffnet am: | 04.03.06 14:05 | von: Cincinnati | Anzahl Beiträge: | 9.621 |
Neuester Beitrag: | 02.02.08 18:40 | von: Chihiro | Leser gesamt: | 821.284 |
Forum: | Hot-Stocks | Leser heute: | 116 | |
Bewertet mit: | ||||
Seite: < 1 | ... | 33 | 34 | 35 | | 37 | 38 | 39 | ... 345 > |
Bin vor ca. 3Wo. bei 1,79 rein.
Gruss
Der Kurs ist doch absolut unterbwertet!!!!
dann wird es ab montag ja mal wieder richtig spannend.
euch allen noch nen schönnen sonntag ;)
mfg
me
Nur mal so zum Vergleich:
De Beira hat m. (7Mio. Unzen Gold) bereits eine Marktkap. von sage und schreibe 300 Mio. Dollar.
June 15, 2006
Blue Pearl Mining Announces Infill Drill Results at its Davidson Molybdenum Project
TORONTO, ONTARIO--(CCNMatthews - June 15, 2006) - Blue Pearl Mining (TSX:BLE)(TSX:BLE.WT)(FRANKFURT:A6R) announced today assays from nine of 16 holes drilled in an infill drill program on the Main Deposit of the Davidson Project near Smithers, B.C.
The highlights of the program were Hole 183, a 122-metre intersection grading 0.670% MoS2 and, within that intercept, 15.3 metres grading 1.920% MoS2; and Hole 189, which cut 15.2 metres grading 1.262% MoS2 within a longer 137.2-metre intercept grading 0.521% MoS2. All nine infill holes intersected significant MoS2 grades across mineable widths (see table below). Results from the remaining seven infill holes are pending.
"We are very encouraged by this latest round of drilling which further establishes the continuity and high-grade nature of the deposit," said Blue Pearl Chairman and CEO Ian McDonald.
He noted that the program was also aimed at generating mineralized material for metallurgical test work and the stress testing of core. Stress tests provide data on the structural aspects of the deposit for mine planning purposes. All the data will be incorporated into the feasibility study currently being conducted by Hatch Ltd., an independent engineering firm. Completion of the study is expected in September and mine development should be under way early in 2007.
Results from this nine-hole portion of the infill program are as follows:
--------------------------------------------------
Depth (m) Width(i) Grade
from to (m) %MoS2
--------------------------------------------------
Hole 181 88.4 99.1 10.7 0.353
--------------------------------------------------
--------------------------------------------------
Hole 182 44.2 54.9 10.7 0.378
and 61.0 115.8 54.8 0.384
--------------------------------------------------
--------------------------------------------------
Hole 183 45.7 167.7 122 0.670
--------------------------------------------------
including 45.7 61.0 15.3 0.898
--------------------------------------------------
including 61.0 76.2 15.2 0.782
--------------------------------------------------
including 76.2 91.5 15.3 1.920
--------------------------------------------------
--------------------------------------------------
Hole 184 30.5 45.7 15.2 0.463
and 61.0 76.2 15.2 0.443
--------------------------------------------------
--------------------------------------------------
Hole 185 0.0 91.4 91.4 0.352
--------------------------------------------------
including 61.0 76.2 15.2 0.687
--------------------------------------------------
--------------------------------------------------
Hole 186 0.0 76.2 76.2 0.332
--------------------------------------------------
including 45.7 61.0 15.3 0.474
--------------------------------------------------
--------------------------------------------------
Hole 187 45.7 91.5 45.8 0.455
--------------------------------------------------
--------------------------------------------------
Hole 188 0.0 91.4 91.4 0.419
--------------------------------------------------
including 0.0 15.2 15.2 0.504
--------------------------------------------------
including 76.2 91.4 15.2 0.590
--------------------------------------------------
--------------------------------------------------
Hole 189 0.0 137.2 137.2 0.521
--------------------------------------------------
including 0.0 15.2 15.2 1.262
--------------------------------------------------
including 15.2 45.7 30.5 0.523
--------------------------------------------------
including 76.2 91.4 15.2 0.738
--------------------------------------------------
(i)The deposit is somewhat irregular; however, the Company postulates
that the widths given are approximate true widths.
The Company recently submitted its draft Terms of Reference to the Province of B.C.'s Environmental Assessment Office and is now preparing the environmental assessment report on the Main Deposit at Davidson.
In addition, mining contractor Procon Mining and Tunneling Ltd. is currently excavating drill stations in the existing adit and will soon begin extending the adit, as previously reported, another 50 metres. These drill stations will allow further exploration to be carried out on the Lower Zone at Davidson.
The Hatch study will determine the feasibility of mining a high-grade portion of the Main Deposit and shipping ore to the Endako molybdenum mine approximately 200 kilometres southeast of Smithers. As previously announced in late February, Blue Pearl has signed a Memorandum of Understanding with Endako Mines for construction of a 2,000-tonne-per-day milling circuit to process Davidson ore at Endako. Discussions are ongoing to optimize a definitive agreement.
Molybdenum prices, meanwhile, remain at historically high levels of approximately US$26 per pound.
Based on a technical report compliant with National Instrument 43-101 and filed on SEDAR, and using a cut-off grade of 0.2% MoS2, the Main Deposit is estimated to contain a measured and indicated mineral resource of 83.0 million tons grading 0.295% MoS2 representing 293.5 million pounds of molybdenum. (The measured category is 5.4 million tons grading 0.309% MoS2 and the indicated category is 77.6 million tons grading 0.294% MoS2; please refer to the Company's news release of March 3, 2005). With regard to this mineral resource estimate, Gary Giroux, P. Eng., is the independent qualified person in accordance with National Instrument 43-101 and has read and approved this news release.
Sampling, Assaying and Quality Control
Samples are taken as half of the split core. ACME Analytical Laboratories Ltd. of Vancouver, B.C., Canada, is being used for sample preparation and assaying. ACME Analytical uses industry standard procedures. Core samples were crushed to pass a 10-mesh-size sieve, a 200- to 250-gram split was then pulverized to have no greater than 95% passing a 200-mesh-sized sieve to produce a homogenized sub-sample.
Internal quality control programs include the use of blanks, duplicates, internal standards, certified standards and internal check assaying. External check assays will be routinely performed at Chemex Laboratories of North Vancouver, B.C. Canada, with check samples submitted independently by the Company.
Qualified Person
Jim Hutter, P.Geo., a consultant to the Company, is the Qualified Person on this exploration program as defined by National Instrument 43-101. The drilling program is being conducted under the supervision of Mr. Hutter who has read and approved this news release.
Datum 19.06.06
Abfrage 19.06.06 09:11:22
Kursstellung 19.06.06 09:03 Kurs 1,54
mfg
me
mfg
me
ich glaube das wir bald wieder steigende kurse sehen werden ;)
news sind schon da,Blue Pearl werden bestimmt bald wieder in einigen foren und empfehlungen auftauchen ;)
mfg
me
Datum 22.06.06
Abfrage 22.06.06 16:32:01
Kursstellung 22.06.06 16:07
Kurs 1,43