möchte folgenden wert vortstellen: Dajin Resources Corp (DJI: TSX-V)
hauptaugenmerk liegt auf dem Salinas Grandes Projekt(Potash,Boron, Lithium) im Norden von Argentinien. Mit Orocobre ltd in direkter Nachbarschaft!!
allerdings besitzt dajin noch weitere gold projekte in Canada BC.
shares outstanding: 65,311,467 common shares
Warrants:
5,242,065 @ $0.30 (expire April 27, 2011)
1,200,000 @ $0.30 (expire May 16, 2011)
Options:
2,475,000 @ $0.11
800,000 @ $0.16
3,625,000 @ $0.22
Fully Diluted: 78,653,532 common shares
cash: 2.500.000 $ (september 2010)
zum einlesen eignet sich das kurze fact sheet: http://www.dajin.ca/_resources/Dajin_Brochure_new.pdf
und die aktuelle (september 2010) Präsentation: http://www.dajin.ca/_resources/September_2010-Powerpoint-DMJv2.pdf
http://www.dajin.ca/
denke das gerade durch das salinas grades projekt hier auch kurzfristig phantasie reinkommen sollte. weitere bohrergebnisse (vom phase 1 bohrungen in 2010) werden erwartet. Langfristig ist denke ich aber noch mehr zu holen. Tolle Lage + kompetentes Managment + super Nachbarn. Fehlen nur noch gute Bohrergebnisse.
würde mich über weiter meinungen und eine anregende Diskussion freuen.
gruß in die runde
black.jack
January 14, 2011
Vancouver, B.C. – The Board of Directors of Dajin Resources Corp. (“Dajin”) (DJI: TSX-V) is pleased to provide a current update on the six well drill program on Dajin’s 100% owned Salinas Grandes/Guayatayoc boron- lithium- potash project in Jujuy province, Argentina.
The first drill hole collared is located near the north/south centre line of the northern concession block of Dajin’s 83,248 hectare (over 200,000 acres) Salinas Grandes/Guayatayoc project. A second drill hole collared is located approximately four kilometres to the west of Hole 1. The location of the third drill hole will be determined based on results obtained in Hole 2.
Hole 1 encountered thick intervals of unconsolidated sands and gravels interbedded with salt and clay horizons with the changes in lithology occurring at depths closely matching those predicted in the interpretation of seismic data by Safari Energy Inc. of Calgary. Hole 1 was drilled to a depth of approximately 300 metres and cased with perforated PVC casing, after several attempts to complete the hole to greater depths. Completion of the hole will be carried out with smaller diameter tubing to be used in an airlift to clean the hole and sample the fluids encountered at depth. Assays will be released after review as they become available.
A second rig was brought to the project in December to collar Hole 2, which was at a depth of approximately 80 metres when drilling was shut down for the Christmas/New Year break. A larger capacity drill will be used on Hole 2 to complete drilling to the targeted 400 metre depth.
Dajin’s six hole program of rotary drilling is designed to determine the characteristics of the several aquifers and their contained fluids that seismic data indicate underlie the Salinas Grandes and Guayatayoc salt lake basins. The holes are being collared with eight inch diameter pipe which is reduced to six inches in diameter as required by drilling conditions. The holes after sampling and geophysical logging will be completed as observation wells by installation of four inch slotted casing. In the event water of a quality suitable for domestic or agricultural purposes is encountered in the drilling that aquifer may be isolated, tested and developed for small scale local use.
Other potash /lithium companies currently exploring in Jujuy province include Orocobre Limited (ORL: TSX-T) and Lithium Americas Inc. (LAC: TSX-T). Orocobre previously announced, “Extensive pit sampling at the Salinas Grandes salar shows the highest average lithium and potassium grades in Argentina and comparable with Atacama brines.”
David Jenkins. P.Geo, a qualified person as defined by NI 43-101, has approved the technical content of this news release.
gruß black.jack
unterstützung bei 0,21$ hat gehalten. gehts jetzt wieder hoch richtung 0,3$?
gibts hier noch andere investierte?
gruß black.jack
From Gold Investor Sun, 02/13/2011 - 22:19 Source: Gold Investor
* Potash News
Article Source:
Gold Investor
With growing grain prices and burgeoning fertilizer demand tipped to make potash one of the hottest commodities of the next few years, investors are flocking to potash stocks in burgeoning numbers—but this week was not without turbulence.
Major firms are seeing multi-year highs: Potash Corp. of Saskatchewan (POT:TSX) closed Friday trading at $186.99,its highest level since late 2008, Agrium Inc. (AGU:NYSE) is also at an over two-year high at $98.49, as is the Mosaic Company (MOS:US) at $88.57.
That’s impressive enough, but down in the minor leagues, investors are buying junior potash stocks in a frenzy not seen since the price of potash spiked up in the first half of 2008. And the gains made so far in 2011 have been nothing short of amazing.
Allana Potash Corp. (AAA:TSX-V) shares have shot up over 200% since January 1, hitting a new 52-week high of $2.43 on Wednesday—but declined to $1.69 by the end of the week. Encanto Potash Corp. (EPO:TSX-V) hit a 52-week high of 65 cents on Feb. 9, and currently trades at 53 cents. IC Potash Corp. (ICP:TSX-V) set a 52-week high of $1.89 on Feb. 11, since slipping to $1.81. And Western Potash Corp. (WPX:TSX-V) hit a 52-week high of $1.70 on Feb 9, edging down to $1.69 at press time.
Analysts predict growing inflation in top consumers such as China, to combine with looming food shortages to keep prices heading upward for at least the near and medium terms. Initially the major potash firms saw a burst of investment, but as the majors’ share prices steadily increase many investors are looking for riskier—but potentially much more lucrative—stocks among the small-cap set.
Interestingly, the riskier early-stage potash plays, such as Marifil Mines Ltd. (MFM:TSX-V; 50-week high of 44 cents on Feb 8) and Passport Potash Inc. (PPI:TSX-V; 52-week high of $1.86 on Feb 9) are seeing substantially more inflow than the more predictable advanced plays.
But is this rush to invest in higher-risk, early-stage plays rational? The proof, as they say, is in the potash. The pressure is on these junior firms to deliver—the major firms will come calling with lucrative buyout offers if they can develop something promising.
After the last run on potash stocks in 2008, the star junior stocks from that period, such as Potash One Inc. (KCL:TSX-V), Athabasca Potash Inc. and Anglo Potash Inc., were bought out by the majors. The current wave of investors are banking on the latest leading juniors such as Allana, Encanto and IC Potash getting snapped up in the next wave of acquisitions—and considering the heightening M&A activity in the potash sector, these acquisitions could well start sooner rather than later.
ist jetzt auf einem sehr interessanten niveau.
ich möchte gerne verbilligen und liege schon seit ein paar tagen in frankfurt auf der lauer, ist ja nich so einfach in D günstig an welche zu kommen.
"bald" sollten ja auch die bohrergebnisse kommen. spätestens dann wird der kurs wieder drehen;) zur zeit ist dajin mit knapp 10.000.000 CA$ bewertet.
gruß black.jack
Apr. 26, 2011 (TheNewswire.ca) --
Vancouver, B.C. - April 26, 2011 - The Board of Directors of Dajin Resources Corp. (TSXV:DJI) ("Dajin")(DJI: TSX-V) reports that a hydrologist from AMEC Earth and Environmental, one of the world's leading environmental and engineering consulting firms is currently sampling Hole #1 and Hole #2 of Dajin's initial drill program located on private land at the north end of the Salinas Grandes/ Guayatayoc salar in northwestern Argentina. The first hole was drilled to a depth of 301 meters and cased with perforated plastic casing to the bottom. The second hole was drilled and cased with identical materials to a depth of 320 meters. These two holes are the first of a planned exploration program designed to drill deeper than is common in the region to date to test the deeper and possibly denser brines in the older sections of the salar basin.
Click on link: Sampling of well
Uncharacteristic wet conditions in the region have reduced access to the salar and the sampling of the drill holes. When the sampling program is completed the samples from the brine bearing aquifers will be delivered to the Alex Stewart lab in Mendoza, Argentina for analysis. The results from the sampling program will be reported when received from the lab.
Brian Findlay, President and CEO reports, "We are very pleased that the rain and flooding has subsided and after numerous unexpected delays we are now back on track with our exploration program. With results pending from our first 2 holes, and the area potential for potash and lithium, this is an exciting time for Dajin shareholders."
Other potash /lithium companies currently exploring in northwestern Argentina, a part of the "lithium triangle" which is reported to be responsible for 80% of the worlds lithium production, includes Orocobre Limited (TSX:ORL) (OOTC:OROCF) (ORL: TSX-T) backed by Toyota and Lithium Americas (TSX:LAC) Inc. (LAC: TSX-T) backed by Mitsubishi. Orocobre previously sampled it's concessions and announced, "Extensive pit sampling at the Salinas Grandes salar shows the highest average lithium and potassium grades in Argentina and comparable with Atacama brines."
David Jenkins, P.Geo, a qualified person as defined by NI 43-101, has approved the technical content of this press release.
For further information please contact:
Brian Findlay or Dave Jenkins Don Mosher
Phone: (604)-681-6151 Phone: 604-638-3166
E-mail: brian@dajin.ca E-mail: don@dajin.ca
Rich Kaiser - Investor Relations
Phone: 800-631-8127 Outside North America #001-757-306-6090
E-mail: rich@yesinternational.com
The TSX Venture Exchange has not reviewed and does not accept responsibility
for the adequacy or accuracy of this release.
Copyright (c) 2011 Thenewswire.ca - All rights reserved.
klar, schon gut. verzögerungen gehören im explorer biss zum alltag!
aber "bald" sollten, die zumindest von mir heiß ersehnten be's, wohl doch veröffentlicht werden. tippe mal auf nächste woche ;)
gruß black.jack
seine antworten waren recht interessant und ich will sie euch (falls hier überhaupt jmd mitliest) nicht vorenthalten.
hier eine zusammenfassung:
meine erste frage betraf den status der ersten beiden bohrlöcher.
er antwortete, das diese im labor angekommen sind und das im juni die ergebnisse erwartet werden.
die zweite frage stellte ich über das laufende bohrprogramm und die verzögerung im zuge des starken regens.
der starke regen dauerte von dezember(wo man die ersten zwei holes schon fertig haben wollte) bis in den märz hinein. die arbeiten sind nun wieder aufgenommen.
seine ziele mit dajin res in den nächsten zwei jahren sieht brian in der agressiven exploration des salinas grandes projekts.
das managment hält selber 9-10 millionen sahres von dajin.
die aktuelle cash situation: etwas unter 2millionen CA$.
zu meiner frage was er zu dem aktuellen share price meint, sagte er nur "Highly undervalued but that is the market. Tsx Venture always gets hurt the most first when there is a market correction."
was soll er als president über seine eigene company auch sonst sagen. gebe ihm aber recht.
der aktuelle share price zeugt sicherlich von den verzögerungen des drilling programs und dem allgemeinen marktumfeld.
dajin ist z.Z. mit CA$ 8Millionen bewertet, hat etwas unter 2millionen cash.
das sollte genug sein um die exploration von salinas grades weiter vorranzutreiben.
bin nun sehr gespannt auf die ersten zwei löcher und denke das kann noch ein spannendes jahr mit dajin werden.
gruß black.jack
Jun. 2, 2011 (TheNewswire.ca) --
Vancouver, B.C. - June 2, 2011 - Dajin Resources Corp. (TSXV:DJI) ("Dajin")(DJI-V) reports results from drill Hole #1 and #2 of two holes drilled to prospect a deep brine aquifer in the region north of Guyatayoc Lake in Jujuy Province, Argentina. The two holes were stopped due to technical reasons at depths below 300 meters, following their entry into the brine aquifer, but above their target depths. Both holes encountered brines of similar salinity. The assay results from Hole #1 and #2 confirmed the presence of potassium, lithium and boron but do not indicate potential for the economic harvesting of potassium, lithium or boron from brines at the north end of Guayatayoc Lake.
The samples were collected in the presence of Dan Emerson, P.Geo., of AMEC Earth and Environmental or by professionals trained by him. Mr. Emerson, a qualified person as defined by NI 43-101, has approved the technical content of this press release.
The Company will now focus on exploration of its properties at the Salinas Grandes Salar which are to the south of Guayatayoc Lake. Further drilling will commence once permit approval has been received from competent authorities in Salta and Jujuy Provinces.
------------------------
enttäuschende ergebnisse! naja jetzt wissen sie wo sie nicht mehr bohren müssen. man kann nur hoffen das es in den südlicheren regionen mehr zu finden gibt!
Jun. 22, 2011 (TheNewswire.ca) --
Vancouver, B.C. - June 22, 2011 - Dajin Resources Corp. (TSXV:DJI) ("Dajin")(DJI-V) reports that Dajin has acquired a 100% interest in 20 mineral claims comprising 8,945 hectares contiguous to their Cowtrail claims in the Cariboo Mining District of B.C. These claims are contiguous to the Woodjam Project where Cariboo Rose Resources Ltd. (TSXV:CRB) /Fjordland Exploration Inc. and Gold Fields Limited (NYSE:GFI) have entered into an option agreement for the drilling and exploration of a copper /gold porphyry system. Gold Fields is currently drilling to depths in excess of 700 metres and has a 7 year work commitment of $19 million to be spent on the Woodjam Project. Results from shallow drilling by Dajin in an initial test of an IP anomaly on the Cowtrail claims included an intersection of 1.16 g/t gold with copper mineralization over 18.3 meters which is believed to be similar in character to that being explored for by Gold Fields. Further drilling on the Cowtrail claims is planned for this summer. Click here to view area map.
Dajin has also acquired a 100% interest in 8 additional mineral claims comprising 2,664 hectares contiguous to the Addie 2 claims and 2 mineral claims comprising 435 hectares south west of the Addie 2 claims. These mineral claims, as reported in the BC Ministry of Energy and Mines records, contain anomalous gold values in soils.
Other noteworthy projects from this area include the Spanish Mountain Gold (TSXV:SPA) (OOTC:SPAZF) discovery which was reported in a NI 43-101 report to contain up to 4 million ounces of gold. Dajin's 100% owned Addie 1 property is adjacent to Spanish Mountain and returned up to 750 ppb gold. As well, Newmont Canada Corp. has recently moved into the area entering into an option agreement with Tiex Ltd. on their Bullion Property which is southwest of Dajin's 100% owned Addie 2 property which returned soil samples of up to 3,683 ppb gold.
Aktuell steht DJI sogar bei 0,095$ allerdings bei sehr dünnem volumen.
naja wird ja auch langsam mal wieder zeit für ne gegenbewegung. und wenn dann "bald" die neuen bohrungen anfangen, kommt auch hier sicher wieder etwas phantasie und volumen rein.
hatte diesbezüglich das managment angeschrieben, die aber noch nicht geantwortet haben. Muss wohl nochmal was schreiben. werde es dann hier reinstellen..
gruß black.jack
die taxe in ffm kannste ja sowieso knicken.
Brian Findlay hat leider noch nicht auf meine email geantwortet. schade, schwierig sonst an infos zukommen..
gruß black.jack
Zum Salinas Grandes Projekt wurde mir mitgeteilt das z.Z. in der Provinz Jujuy (Wo sich das Projekt befindet) die Richtlinien der Minenpolitik umgestaltet werden im Zuge neuer Wahlen. Bis im Oktober der neue Gouverneur gewählt wird und somit auch das "MInesterium für Bergbau" neu besetzt wird, geht man nicht davon aus das auf dem Gebiet gebohrt werden darf.
Man versicherte mir das der Vulkanausbruch in Chile keine Einwirkung auf die Gebiete sowie die Aktivitäten dort hatte.
Zu den neu erworbenen Goldgebieten in BC sagte man mir das sie für "kleines" Geld von der Regierung erworben wurden, da andere Unternehmen die "Aufrechterhaltungsgebühr" nicht bezahlt haben. Bohrungen auf Cowtrail und Addie 1 sollen "später" in diesem Jahr beginnen.
-----
gruß black.jack
Der aktuell unglaublich starke Goldpreis wird Dajin dabei in die Karten spielen. Die nächsten Tage sollen die Auswertungen eines "sampling program" veröffentlicht werden das Anfang des Jahres auf Addie1 abgeschlossen wurde.
Das könnte für positiven newsflow sorgen. Auch auf die in #16 angekündigten bohrprogramme bin ich sehr gespannt.
Die Goldprojekte von Dajin, über die ich hier im thread noch nicht allzuviel geschrieben habe, liegen in vielversprechender nachbarschaft wie folgender map zu entnehmen ist.
wenn hier jmd interesse dran hat, einfach mir ne bm mit seiner email adresse schicken. dann geb ich euch das gerne weiter.. falls es hier überhaupt noch andere investierte/interessierte gibt?!
Folgende ergebnisse von orocobre zeigen aber auch das potential von salinas grades auf. wenn hier im laufe des jahres die genehmigungen erteilt werden..
http://www.orocobre.com.au/PDF/...inasGrandesDrillingResultsFINAL.pdf
gruß black.jack
charttechnisch gesehen wirds jetzt kritisch. allerdings ist dajin schon jetzt so günstig bewertet das es wohl kaum noch viel tiefer gehen sollte (mMn)
Zumal es doch in "naher Zukunft" wieder ein paar Lebenszeichen von seiten dajins geben sollte (bohrungen auf gold liegenschaften, wahlentscheidung in argentinien + permit für weitere bohrungen). Wenigstens kommt in den Handel in Kanada diesen Monat wieder etwas Volumen rein.
Auf meine Beschwerde email wegen dem "sampling program" was ja laut brian veröffentlich werden sollte habe ich keine antwort gekriegt. Mein ton war wohl doch etwas harsh. werde es nochmal versuchen.. (diesmal etwas netter;))
gruß black.jack
(via Thenewswire.ca)
Vancouver, B.C. - October 5, 2011 - Dajin Resources Corp. ("Dajin") (DJI-V) reports that Dr. V. Levson, President of Quaternary Geosciences Inc. and former Executive Director of Resource Development and Geoscience with the B.C. Ministry of Energy and Mines, has completed a program of Quaternary mapping and sampling at its Addie 1 gold property located adjacent to and south east of the Spanish Mountain gold discovery. The objective of the work was to develop data to assist in the selection of drill targets needed to test an extensive gold geochemical anomaly on the property. The results confirmed the assays from the Dajin's 2010 soil sampling program and determined the character and origin of the surficial geological materials sampled in the 2010 and earlier programs.
The Quaternary mapping and sampling program at Dajin's Addie 1 property confirmed high gold values at six multi-site multi-element (gold and arsenic and/or antimony) areas on the steep slopes occurring near the south end of Spanish Lake.
High gold concentrations found at all of these sites in earlier programs were reproduced in the 2011 sampling program, usually with higher gold contents than the original soil gold values. The gold was determined to occur mainly in colluvial sediments and weathered bedrock that originated either in place or short distances upslope from the sample locations. One of the important findings of the study is that samples collected from deeper soil horizons commonly contain greater and more representative quantities of gold. An important conclusion of the study is that the thin till cover on gentle slopes adjacent to the gold anomalies may well mask significant gold source areas that remain undetected on the property under soils where the depth of sampling was insufficiently deep.
Dajin is awaiting receipt of permits to allow the company to commence drilling and other exploration work at the Addie 1, Addie 2 and Cowtrail properties.
schlusskurs $0.110 Change: 0.035 (46.67%) Volume: 522,400
endlich der lang erwartete rebound- oder weiß da schon jmd mehr?
brian findlay hat in der letzten zeit einiges am markt eingesammelt.
siehe: http://canadianinsider.com/coReport/allTransactions.php?ticker=dji
der beginn der bohrungen auf den gold gebieten ist wohl nur noch formsache (siehe news vom 05.10)
auch sollte bald wieder bewegungen in die argentinien geschichte kommen. die wahlen finden am 23.10 statt.. allerdings wird es noch etwas länger dauern bis die neuen genehmigungen erteilt werden.
gruß black.jack
(via Thenewswire.ca)
Vancouver, B.C. - November 4, 2011 - Dajin Resources Corp. ("Dajin") (DJI-V) reports that it has commenced a 12 hole - 2400 meter diamond drill program at Dajin's 100% owned Addie 1 gold project located in the Cariboo Mining District in south central British Columbia which is adjacent to and southeast of Spanish Mountain Ltd.'s (SPA -V) 1.9 million ounce Spanish Mountain gold deposit.
The 12 HQ gauge (2.5" diameter) diamond drill holes will test the strong gold and gold pathfinder element targets identified by Dajin's 2010 soil sampling program. Gold was initially interpreted to occur mainly in colluvial materials, sediments and weathered bedrock that originated either in place or a short distances upslope from the sample locations. This interpretation and the targets were subsequently confirmed by Dajin's 2011 Quaternary mapping program carried out by Dr. Vic Levson, an independent geological consultant and former Executive Director of Resource Development and Geoscience with the BC Ministry of Energy and Mines. Dr. Levson commonly found even greater quantities of gold deeper in the soil profile at six multi-site multi-element (gold and arsenic and/or antimony) anomalous areas on the slopes occurring south of Spanish Lake.
(via Thenewswire.ca)
Vancouver, B.C. - November 9, 2011 - Dajin Resources Corp. ("Dajin") (DJI-V) reports that it has commenced a 6 hole - 2400 meter diamond drill program at Dajin's Cowtrail gold / copper porphyry project located north of Horsefly in the Cariboo Mining District of south central British Columbia. This location is within the mineral deposit prolific Quesnel Trough approximately midway between the Mount Polley copper / gold mine to the northwest and Gold Field Limited's advanced copper / gold porphyry project to the south.
The 6 NQ2 gauge (2.0" diameter) diamond drill holes will follow-up a gold / copper intersection (1.16 g/t gold and 0.043% copper over 18.3 meters) obtained by Dajin in an earlier drill program at the Cowtrail and will test additional I.P. anomalies identified in a survey Dajin completed in 2008.
------------------------------------
Die beiden jetzt angefangenen bohrprogramme hören sich sehr interessant an.
Bin auf die Ergebnisse gespannt.. Es ist wichtig das die Ergebnisse gut werden und den Kurs positiv beeinflussen. Nach der Beendigung dürfte dajin nicht mehr allzuviel cash haben..
Auf bin ich gespannt wann es news zu Argentinien gibt.
gruß black.jack
naja viel neues steht nicht drin.. werde wohl mal wieder mit brian kontakt aufnehmen..
kurs präsentiert sich über die letzten monate auch sehr schwach. bei geringem volumen.
Sorgen macht mir die finanzielle situation von dajin. eine kapitalmaßnahme auf diesem kursniveau würde eine große verwässerung nach sich ziehen..
gruß black.jack
Man kann nur hoffen das das kein vorgeschmack auf die bohrergebnisse ist. da sollte auf jeden fall mind. ein treffer dabei sein, sonst siehts ganz bitter aus.
Hoffe brian antwortet mir mal auf meine mail..
gruß black.jack