ADX Energy: Projekte, Partner, Nachbarn, Umfeld
Seite 20 von 105 Neuester Beitrag: 23.11.24 18:20 | ||||
Eröffnet am: | 05.02.13 22:44 | von: Japetus | Anzahl Beiträge: | 3.613 |
Neuester Beitrag: | 23.11.24 18:20 | von: Mr. Moneyp. | Leser gesamt: | 1.136.002 |
Forum: | Hot-Stocks | Leser heute: | 874 | |
Bewertet mit: | ||||
Seite: < 1 | ... | 17 | 18 | 19 | | 21 | 22 | 23 | ... 105 > |
ADX Romania Seismic Operations Update
ADX Energy Ltd (ASX:ADX) is pleased to report the acquisition of additional 2D
and 3D seismic data in its Romanian EX‐10 Parta license is expected to start in
September.
Earlier in the year approximately 90 km of 2D seismic data of excellent data
quality had been acquired. With an unusually rich harvest season in Romania
coming to an end, most of the permit work has been successfully completed.
ADX now expects operations to start in about mid September after a number
of unexpected environmental and administrative issues with local bureaucracy
have been cleared.
Seismic contractor Prospectiuni Srl has already assigned a seismic acquisition
crew, which is currently completing a survey elsewhere in Romania.
Some of the additional 2D seismic data will target a new prospect which was
identified from the seismic data acquired earlier in the year. ADX expects that
the additional data will confirm the relatively large structure with an
associated AVO anomaly that is interpreted to be an indicator of potential
hydrocarbons. Drilling preparations for this prospect and others could start by
mid October.
Mehr und Quelle:
http://www.asx.com.au/asxpdf/20130812/pdf/42hm886hhb6tgt.pdf
und 3D-seismischen Daten in seiner rumänischen EX-10 Parta Lizenz wird voraussichtlich im starten
September statt.
Zu Beginn des Jahres etwa 90 km von 2D-seismischen Daten von ausgezeichneter Daten
Qualität erworben worden. Mit einem ungewöhnlich reiche Ernte in Rumänien
zu einem Ende kommt, hat die meisten der Genehmigung Arbeit erfolgreich abgeschlossen.
ADX erwartet nun Operationen beginnen in etwa Mitte September nach einer Reihe
unerwarteter Umwelt-und administrative Fragen mit lokalen Bürokratie
gelöscht wurden.
Seismische Auftragnehmer Prospectiuni Srl hat bereits eine seismische zugeordnet
Mannschaft, die derzeit abgeschlossen wird eine Umfrage anderswo in Rumänien.
Einige der zusätzlichen 2D-seismischen Daten zielen auf eine neue Perspektive, die war
identifiziert aus den seismischen Daten erworben früher im Jahr. ADX erwartet, dass
die zusätzlichen Daten bestätigen die relativ große Struktur mit einem
zugeordneten AVO Anomalie interpretiert als Indikator für Potential ist
Kohlenwasserstoffe. Drilling Vorbereitungen für diese Aussicht und andere konnten durch starten
Mitte Oktober.
Parta Permit Hintergrund
Die Parta Permit umfasst eine Fläche von 1.221 km2 und liegt im südlichen befindet
Pannonischen Becken von Westen Rumäniens. Es enthält auch 7 herausgeschnitten Öl-und
Gasfelder in seinem Umfang und gilt als wenig erforscht. Exploration
Tätigkeit eingestellt hat in den frühen achtziger Jahren mit den meisten Brunnen in den sechziger Jahren gebohrt und
siebziger Jahre. Keine 3D-Seismik hat für die Exploration Zwecke erworben.
Geologische und geophysikalische Arbeiten von ADX hat bisher zur Identifizierung geführt
mehrere konventionelle Leads und Interessenten, die kumulativ geschätzt werden
enthalten eine erzielbare mittlere Interessenten Potenzial von 47 mmbls von Öl
und 480 bcf Gas.
Die wichtigsten Bohrziele sind zwischen 800 bis 2000 Metern Tiefe liegt,
wobei die wichtigsten Gas-Potenzial ist in den flacheren Abschnitt. Die geplante
Explorationsaktivitäten von 2D-und 3D-Seismik ermöglicht die Abgrenzung der
zusätzliche drillable Aussichten und die Aufrüstung von bereits identifizierten Ziele zu
bohren Betriebsbereitschaft. Die seismischen 3D-Ziele überwiegend Öl Perspektiven identifiziert
auf Vintage 2D-Seismik in der Nähe von produzierenden Öl-Felder. Die 2D-Seismik weiter
Abgrenzung eine Mischung aus Öl und Gas Aussichten auf Vintage 2D seismischen Daten identifiziert.
Rumänien stellt eine wichtige Wachstumschance in Einklang mit der ADX
laufende Strategie der Fokussierung seiner Ressourcen auf Kernbereiche, die bieten
Materialität, bewährte prospectivity, exzellente steuerliche Bedingungen und Zugang zu Märkten,
einschließlich direkter Gastransport in den europäischen Märkten.
Mit der Seismik geht´s also voraussichtlich im September weiter. Nun denn. Da lag ja Strachan mit seiner Einschätzung richtig, wenn es dann wirklich läuft.
Wenn man mit den "drilling preparations" evtl. bereits im Oktober starten will, dann scheint man wie East West Petroleum teilweise parallel zur Seismik zu arbeiten, d.h. mit dem Bohrprogramm zu beginnen bevor die Seismik komplett abeschlossen ist.
Was bedeutet eigentlich "ADX"?
Vielleicht: Additional Delays, uneXpected ? ;-)
Vielleicht warten Sie nur darauf diese eine Struktur noch mit 3D zu bestätigen.
Dann könnte das Drilling Projekt anlaufen während die restliche Seismik geschossen wird.
"administrativ" - wir erinnern uns ja an die videos und Lokalberichte inklusive Websitehack...
In der AGM-Präsentation S.17-18 wurde ja schon was interessantes aus der 2D-Seismik gezeigt. Leider ist man in den Meldungen oft etwas unkonkret, so dass nicht ganz klar ist, ob es sich bei dem Beispiel im AGM S.17-18 um genau die Struktur handelt, bei der man laut der heutigen Meldung eine "AVO-Anomalie" gesehen hat. Die sollten die Leads und Prospects mal durchnummerieren und die Dinge bei der Nummer nennen, solange das Kind noch keinen Namen hat. Es war ja auch mal die Rede von einem Prospect "Saint M". Ist der das vielleicht? Wäre schön hier mehr Klarheit zu haben um die Dinge besser verfolgen zu können.
AVO, wat is dat dann? Habe mal schnell nachgeschaut. Es ist eine spezielle Auswertung der seismischen Daten, die in manchen Gegenden der Welt, aber nicht in allen, gute Ergebnisse liefert, um Öl- und Gas-Vorkommen zu idntifizieren. Sicher ist sie natürlich auch nicht. Ohne Bohrung keine Sicherheit. Aber zum De-Risking eignet sie sich.
http://en.wikipedia.org/wiki/Amplitude_versus_offset
http://www.geoexpro.com/ckfinder/userfiles/files/...%20the%20evil.pdf
>>
Applications in the oil and gas industry
The most important application of AVO is the detection of hydrocarbon reservoirs. Rising AVO is typically pronounced in oil-bearing sediments, and even more so in gas-bearing sediments. Particularly important examples are those seen in turbidite sands such as the Late Tertiary deltaic sediments in the Gulf of Mexico (especially during the 1980s–1990s), West Africa, and other major deltas around the world. Most major companies use AVO routinely as a tool to "de-risk" exploration targets and to better define the extent and the composition of existing hydrocarbon reservoirs.
AVO is not fail-safe
An important caveat is that the existence of abnormally rising or falling amplitudes can sometimes be caused by other factors, such as alternative lithologies and residual hydrocarbons in a breached gas column. Not all oil and gas fields are associated with an obvious AVO anomaly (e.g. most of the oil found in the Gulf of Mexico in the last decade), and AVO analysis is by no means a panacea for gas and oil exploration.<<
Vor der Säurestimulation ist das Werkzeug im Bohrloch steckengeblieben und muss jetzt erst rausgeschnitten werden.
Aber bereits vor der Stimulation wurde "fluid" inkl. Öl gefördert: siehe Fotos in der Meldung.
Dauert also noch länger und wird noch teurer, aber könnte was werden, wenn sie das Loch wieder frei bekommen und die Stimulation wirkt wie erhofft.
http://www.cooperenergy.com.au/Upload/...n-Test-Update---12-08-13.pdf
http://www.enquest.com/media-centre/press-releases/2013/29-05-13.aspx
Da könnte man auch mal noch reinschauen zwecks Vergleich mit dem geplanten Sicily Channel Farmout.
http://cb.iguana2.com/netwealth2/depth/adx
http://www.riftbasinresources.com/news.html
>>
Chorbane Farmin Update
Rift Basin wishes to provide an update on the farmin agreement (the “Farmin Agreement”) between the Company’s wholly-owned subsidiary, Rift Basin International Corp. and Alpine Oil & Gas Pty Ltd., a wholly-owned subsidiary of Australian-based ADX Energy Ltd. (ASX: ADX). Further to its news release of May 3, 2013, the Company has requested the return of its refundable US$100,000 and termination of the Farmin Agreement with effect July 31, 2013. Due to the state of the capital markets, the continued instability within the MENA region, and lack of receptivity towards exploration opportunities, the Company was not able to complete the requirements necessary to close the Chorbane Transaction. The Company has determined that opportunities in East Asia and Indonesia in particular offer better alternatives on which to focus limited resources.
<<
http://www.adx-energy.com/documents/...ROSPECTSUMMARYMAY2013FINAL.pdf
Jetzt stellen sich zwei Fragen:
Finden sie schnell genug einen anderen?
Wenn nicht, wie lange reicht das Geld, abzüglich des Bedarfs für die Rumänien-Seismik, noch und was passiert wenn es alle ist?
Keine schöne Situation, zumal auch das Sicily-Channel-Farmout noch völlig offen ist.
......Rift has already made a good faith payment of US$100,000 to ADX.....
....Rift's good faith payment will be non refundable......
Quelle:
http://www.asx.com.au/asxpdf/20121128/pdf/42bjb1j9jxzls0.pdf
Welchen Inhalt diese haben, weiß ich auch nicht. Kann auch sein, dass wieder irgendetwas Nichtssagendes kommt - aber es kommt etwas. Anfang nächster Woche!
Ich erwarte da nichts Herausragendes, weil via Buschfunk der Kurs sonst schon angestiegen wäre. Aber wer weiß???
Lassen wir uns überraschen!
Greets,
Chemie Ali
hast Du diese Info von der PR bekommen?
Ich würde da momentan auch nur mit einer Vertröstung rechnen, dass man sich weiter bemühe und bla.
Tunesien ist seit der Revolution schwierig, wie man bei RIF sieht. Was das betrifft hatte ADX einfach Pech. Da aber durchaus noch Deals stattfinden, insbesondere auch Offshore (Beispiele hier im Thread), könnte es noch eine Chance auf erfolgreiche Farmouts geben. Aber die würde ich vorsichtigerweise <50% sehen.
Tja, es ist wie es ist. Wenigstens geht es der Eurozone wieder besser. MENA brauchst noch Zeit sich neu zu erfinden.
PS:
http://www.youtube.com/watch?v=DMUOX9Hw83w
;-)
Die Flow Rates sind wie erwartet (aufgrund der historischen Bohrungen) sehr niedrig (24 bopd, 22 mcf), obwohl es sich um light oil handelt (45 API) und sollen durch Stimulation gesteigert werden. Ergebnis dieses extended Testing wird im September erwartet.
Die target zones von Jimbolia liegen bei ca. 2550 m.
ADX schreibt im letzten News Release, dass ihre mittleren Zieltiefen zwischen 800 und 2000 Metern liegen. Von daher könnte es sein, dass ADX andere geologische Formationen anpeilt.
Es wäre mal interessant, eine Übersicht der Leads und Prospects von Parta zu bekommen, wie es sie für die tunesischen Konzessionen gibt.
Maybe there were some "weak" farm in offers.
Fragt sich nur, ob ADX dabei noch involviert ist. Wenn sie die zweite Permit-Extension bekommen, steigt die Wahrscheinlichkeit dafür. Wenn nicht, ist es wohl eh vorbei mit den Offshore-Ambitionen. Also noch ein halbes Jahr warten und schauen was bis dahin passiert.
Es scheint ja geologisch gute Arbeit geleistet worden zu sein (zur Erinnerung: Artikel in der Fachzeitschrift "The Leading Edge", Vortrag auf der APPEX, Feedback zum Data Room).
Tunesien ist mometan ein Unsicherheitsfaktor, dürfte sich aber irgendwann stabilisieren. Investitionen aus dem Ausland müssten hoch willkommen sein, egal ob die Regierung islamisch oder säkular ist. Man sieht ja auch, dass momentan durchaus Deals und Bohrungen stattfinden. Kann aber sein, dass derzeit die Entscheidungsprozesse bei potentiellen Interessenten deswegen länger dauern.
Waiting Game...
http://www.youtube.com/watch?v=nZtxVtMDLg0
Das aber nur, weil kleinere westliche Explorer (East West Petroleum, Zeta Petroleum, Moesia Oil and Gas) als JV-Partner beteiligt sind und regelmäßig berichten, denn Firmen der Größe wie NIS berichten nicht unbedingt so detailliert über einzelne Bohrungen.