Monument Mining LTD. A0MSJF


Seite 195 von 197
Neuester Beitrag: 13.03.24 14:48
Eröffnet am:13.07.07 11:12von: RöttgenAnzahl Beiträge:5.902
Neuester Beitrag:13.03.24 14:48von: PolluxEnergyLeser gesamt:841.291
Forum:Hot-Stocks Leser heute:132
Bewertet mit:
33


 
Seite: < 1 | ... | 193 | 194 |
| 196 | 197 >  

4537 Postings, 7008 Tage bradettiMal schauen was Canada

 
  
    #4851
08.08.18 10:41
aus der guten News heute macht!  

4537 Postings, 7008 Tage bradettiHab mir das jetzt auf der HP

 
  
    #4852
08.08.18 11:22

mal etwas genauer angesehen:

Investment Profile
- Selinsing Gold Mine in Malaysia
-$256.7 million mineral property portfolio in Malaysia and Western Australia
-8 years in production for 273,451 ounces with $374.4 million revenue
-6 years extended mine life with NI43-101 resources of 764 koz including reserves of 279 koz Au at 1.4 g/t
- Exploration potential over 1 Moz
- Murchison Gold Project in Australia
-644 Koz Au historical JORC resources at time of acquisitions
-381 koz Au NI43-101 resources at Burnakura with 293 Koz indicated, 88 Koz inferred
-Full operating 108 man camp and 260Ktpa Gold Processing Plant
-PEA program underway to further advance planned early stage production
-Exploration potential over 1 Moz

Das hört sich für ein Unternehmen mit einer aktuellen MK von 21Mio CAD nicht sooo schlecht an.....

 

4537 Postings, 7008 Tage bradettiSo, mal schauen

 
  
    #4853
08.08.18 15:07
wie sich die Eröffnung in Canada darstellt. Üblicherweise kommt da drüben ja immer bissel mehr Bewegung erst nach der Mittagspause rein....  

4537 Postings, 7008 Tage bradettiVon goldinvest:

 
  
    #4854
09.08.18 10:29
Monument Mining: Eine Vermutung bestätigt sich!

Im Mai hat Monument Mining (WKN A0MSJR / TSX-V MMY) auf dem Burnakura-Goldprojekt in Australien neue Bohrarbeiten gestartet. Ziel war es, die Goldressourcen auf dem Areal zu erhöhen. Bis Mitte Juni sollten insgesamt 80 Bohrungen in drei Programmen durchgeführt werden. Die Gesamtlänge der von Mitchell Operations durchgeführten Bohrungen sollte 5.075 Meter umfassen.

Die Explorationsarbeiten sind inzwischen wie geplant abgeschlossen, die Analyse der Bohrkerne läuft. Erste Ergebnisse sind aber schon bekannt und sorgen für einige Phantasie und Aufsehen.

Vollständiger Artikel hier:
https://www.goldinvest.de/aus-der-redaktion/...mutung-bestaetigt-sich  

70 Postings, 4196 Tage Schrecklicher Svenje besser die Meldungen werden

 
  
    #4855
09.08.18 21:01
desto tiefer geht der Kurs. Wenn das so weiter geht kauf ich die ganzen Schuppen mit allen assets um ein paar Mille :-)
 

289 Postings, 4231 Tage Kurt1989hi lach

 
  
    #4856
09.08.18 21:35
21 Millionen an Market cap bei ca 250 Millionen an Assets und bestimmt 20 Millionen an Cash....

Monument Mining wird nur noch mit dem Cash gewertet total Krank wo soll das nur Enden irdenwann muss der Markt doch mal das Potenzial von Monument Mining erkennen....

Jedes Explorer Bude wird gehypt von den Börsenbriefen und für Monument Mining interessiert man sich nicht )))  

289 Postings, 4231 Tage Kurt1989DFS

 
  
    #4857
01.09.18 03:21
Naja mal sehen wie lange sich die DFS Studie noch verzögert glaube das liegt leider nicht in Monument Mining Hand die Consulting Firmen fertigen diese Studie ja an....

Müsste nicht zu Murchsion auch noch die PEA Studie kommen?

Und im 4 Quartal wurde doch Intec Copper die Testarbeiten zugesagt oder?  

289 Postings, 4231 Tage Kurt1989Bohrergebnisse das 1 Programm von 3

 
  
    #4858
24.09.18 19:12
Hier mal die erste Runde Bohrergebnisse

https://www.juniorminingnetwork.com/...at-burnakura-gold-project.html

Was meint ihr dazu?

Mal sehen was die anderen Programm so bringen aber sollten nicht 500 000 bis 1 Million + an Unzen auf Murchsion liegen?

Denke mal mit der PEA werden wir auch eine aktuelle Recourcenschätzung erhalten)  

289 Postings, 4231 Tage Kurt1989Quartalszahlen

 
  
    #4859
02.10.18 21:57
Hi gibt es Meinungen zu den aktuelle Quartalszahlen die Produktion ist massiv gestiegen

https://www.goldinvest.de/aus-der-redaktion/...otenzial-wird-groesser

Alle warten auf die DFS Studie zu Selinsing und die Mengapur Recourcenschätzung sollte bis Oktober abgeschlosse sein laut dem Quartalsbericht.

Bei der Goldförderung sieht es noch besser aus. Die Gesellschaft hat 22.854 Unzen aus dem Boden geholt, ein Jahr zuvor waren es 12.845 Unzen. Der durchschnittliche Goldgehalt legt von 0,8 Gramm/Tonne auf 1,03 Gramm/Tonne zu. Gleichzeitig können die Kosten verringert werden. Im abgelaufenen Geschäftsjahr liegen die Cash Costs je Unze bei 753 Dollar – ein Jahr zuvor stand dieser Wert bei 936 Dollar.  

289 Postings, 4231 Tage Kurt1989video interview

 
  
    #4860
16.10.18 18:53
Hier mal das aktuelle Interview

https://goldinvest.de/videos/video/...t-goldproduzent-monument-mining

Was sagst ihr zu den Aussichten?

DFS Studie soll im November 2018 kommen

Und Recourcenschätzung ist wohl im Oktober fertig zu Mengapur  

289 Postings, 4231 Tage Kurt1989Monument aktuell

 
  
    #4861
02.12.18 13:45
Ja also alle Warten auf die DFS Studie und am 14 Dezember ist HV Versammlung denke kurz vorher kommen News. Ich hoffe hier kommt bald mal mehr leben ins Forum.

Quartalszahlen waren nicht so prickelnd

https://www.monumentmining.com/news-media/news/...iscal-2019-results/

Hier ein Interview mit Cathy von Stocktelegraph

https://www.youtube.com/watch?v=EKkK9KK_dcM

Hier noch ein Interview von Goldinvest

https://www.youtube.com/watch?v=QIhWt94ieoQ  

70 Postings, 4196 Tage Schrecklicher SvenQuartalszahlen "nicht so prickelnd"?

 
  
    #4862
1
02.12.18 17:18
die Interpretation der zahlen von Monument ist relative "relativ".
Ich stell da mal eine Milchmädchenrechnung an:
Nettogewinn im abgelaufenen Quartal: USD 1,062 Mio  -  hochgerechnet auf ein Jahr wären dies USD 4,268 Mio --> das bei einer Marktkapitalisierung von USD 12,908 Mio - ergibt ein KGV von 3,04
--> ist aus meiner Sicht nicht so übel.
Dazu verfügt das Unternehmen über "flüssige Mittel" (cash und cash equivalents) in Höhe von USD 13,745 dazu noch Inventar mit USD 17,144 bewertet.
Sie habe auch ein paar Liegenschaften: Selsing (150,3 km²) mit 279.00 OZ angezeigte und 761.000 OZ geschlussfolgerten Gold. Murchison: (258,7 km²) mit 293.000 angezeigten und gut 300.000 OZ (lt alten Schätzungen) und auch noch Mengapur (9,35 km²) mit "etwas" Kupfer, Schwefel, Gold und Silber.
und das bei einer Marktkapitalisierung von USD 12,9 Mio.
Während ich das schreibe hab ich eine Idee: ich rede morgen mit meiner Hausbank und frage um einen kleinen Kredit - dann kaufe ich mir ein Minenunternehmen namens Monument Mining - behalte es gut 4  Jahre - dann habe ich mein Investment wieder durch Gewinne hereingebracht und dann verkaufe ich ein paar m² "Goldland" - mit dem Ertrag geht ich dann mal schön Essen.
Ich hoffe es kommt kein Investor auf diese Idee.  

289 Postings, 4231 Tage Kurt19892019

 
  
    #4863
18.12.18 08:23
Hi also ich glaube der Schlüssel in 2019 wird Peranghi sein das neue Areal und ob man dort genug Unzen finden wird um dort wieder 8000 Unzen bis 10 000 Unzen pro Quartal zu schaffen hängt halt von Gramm pro Tonne ab...

im 1 Quartal 2019 soll die Zufahrtsstraße fertig sein

Und auf Murchsion will man PEA presentieren + aktuelle Recourcenschätzung wurde ja viel gebohrt....

Mengapur sucht man ja einen Partner und will dann die Testarbeiten mit Intec Machen und PEA Studie anfertigen

Was haltet ihr von Intec Copper? das Mengapur Projekt wird bei diesen Kupferpreisen wirklich interessant wie ich finde)  

289 Postings, 4231 Tage Kurt1989Kommentare Kanadischem Board zu Monument Mining)))

 
  
    #4864
11.01.19 18:14
dublebad wrote:
The balance sheet contains, in addition to $18 million cad in cash,  another $22 million in gold inventory ot which $ 13 million cad is in saleable gold ingots.

About $0.13 per share in cash and cash equivalents.
Next week Sulphide report

Quelle : http://www.stockhouse.com/companies/bullboard/...#gZJW9GfKORh1XJht.99

Current resources for just a portion of Burkenara would sustain 40,000 oz per year from open pit mining from the 500,000 ton mill.

Underground would be at least 3 times richer in grade, implying 120,000 oz per year.
Get in cheaply while you can.
We have the Sekinsing Sulphide Study Coming any day now
Read more at http://www.stockhouse.com/companies/bullboard/...#pXoEqoTYXLWiQ8Tw.99

Murchison Gold Project  consists of Burnakura, Tuckanarra and Gabanintha
Western Australia.

Together, these 3 produced nearly 600,000 oz from 23 surface pits.
No greenfield exploration has taken place in the last 20 years and none whatsover at depths below the pits.

Already at just Burnakura , the new resource estimate of 380,000 oz has trippled the previous historical resources in 2015.

For all 3 project areas, 644000 oz have been estimated by historical analyses.
Drilling at Burnakua is now resuming with targets being deeper zones beneath the open pits and locating new pits.
Plans are to double the size of the current mill to 500,000 tons.

If the deep drilling hits commecial grades this quarter,  and with 23 open pits offering similar underground motherlodes, we are off to the big races.
Read more at http://www.stockhouse.com/companies/bullboard/...#wPc3p0iJaQ6BeTsH.99

2019 Production based Valuation
I assume 2019 Production, defined as the next 4 quarters, of 20,000 oz.
I assume $1750 cad per oz as the POG.

All in cash costs ( excluding capex )  were $ 1000 cad /oz for 2018, but $ 750 cad/oz  in Q4/18 and $800 cad /oz for Q1/19.

I use $800 cad /oz as the all in cash cost for 2019.

That is, cash margins will be $950 cad per oz of gold production, which @ 20,000 oz, results in annual cash flow of $19 million cad or about $0.050 pedr share.

Given its pristine balance sheet, and strong growth prospects including the resources to boost production to 100,000 oz per year, a cash flow multiple of at least 10 should apply.

This provides for multiples of upside from its current production, and exemplary gains in valuation on reaching 100,000 oz of production.

Read more at http://www.stockhouse.com/companies/bullboard/...#58JGETcciFzaqEZT.99  

289 Postings, 4231 Tage Kurt1989IR Abteilung Kanada Bitte an die Aktionäre

 
  
    #4865
17.01.19 21:46
Thank you for providing this information. We are updating our records here.

It is very difficult for us to update our European shareholders records without the help from shareholders.

Can you let the European shareholders you know they can contact me to update their contact information and shareholdings for Monument.

This will help us with communication with shareholders.



Thank you.



Regards,



Richard  

289 Postings, 4231 Tage Kurt1989aktuelle Studie

 
  
    #4866
01.02.19 16:05
https://globenewswire.com/news-release/2019/02/01/...ine-Project.html

Economic Evaluation

Economic viability has been demonstrated for approximately six years of life of mine (LOM) with an NPV of US$27.56 million based on reported oxide and sulphide ore reserves as of March 2018. Over the six-year LOM, a total 5.7 million tonnage of ore would be treated at an average grade of 1.45g/t for 223 koz at US$863.67/oz. At a gold price of US$1,300 per ounce, the Selinsing Gold Mine Project would generate net cash flow after tax of US$97 million from operations, or US$45 million net of capital expenditure. Sensitivities show that the project can withstand well over a 35% increase in costs but is sensitive to gold price (US$1,100/oz breakeven) and process recovery (70% breakeven).

The above economic evaluation does not include Inferred Mineral Resources. Currently (i) The Inferred Mineral Resource inside the Reserve open pit designs contains an additional 20 koz of gold; (ii) Inferred Mineral Resource external to the open pit design contains 130 koz of gold.  Recommendations have been suggested to initiate further exploration programs, aimed on conversion of Inferred Mineral Resources to Indicated Mineral Resources. Should those conversions be successful, the Mineral Reserves could potentially be significantly increased.

The Selinsing Gold Mine has a proven record in converting oxide Inferred Mineral Resources to recovered ounces in its 10-year production history, although the previous production history may not be used as an indicator for future production.  

289 Postings, 4231 Tage Kurt1989Schuldenblase /Gold

 
  
    #4867
17.02.19 19:04
Hallo hier mal ein ganz Interessanter Artikel

https://nationalpost.com/news/...lievable-scale-of-u-s-debt-right-now

Bin mal gespannt wann irgendeine der Schuldenblasen Platz

Und ob Monument Mining davon dann Profitieren kann hoffe nur das dann zumindest -1-2 Goldminen voll laufen

Was erwartet ihr so für Goldpreise?
 

289 Postings, 4231 Tage Kurt1989Neues Video

 
  
    #4869
14.03.19 11:56
Hier das neuste Video von Monument ich sag mal so geben wir ihr einfach mal 12 bis 24 Monate Zeit

Es scheint ja in die richtige Richtung zu gehen

https://www.goldinvest.de/videos/video/...nt-mining-von-der-pdac-2019  

289 Postings, 4231 Tage Kurt1989Neues Video Interview PDAC 2019

 
  
    #4870
1
18.05.19 22:30
Hallo hier ein Interview von der PDAC 2019 in diesem Monat müssten noch die Quartalszahlen der Firma kommen

https://smallcappower.com/videos/...video/monument-mining-gold-stock/

Bin sehr gespannt aktuell wird an der PEA Studie zu Murchsion gearbeitet und die Großprobe von Peranghi steht auch noch aus.

Kupfer liegt bei 6000 Dollar
Eisenerz bei 96 Dollar

Damit sollte so langsam auch Mengapur wieder in den Fokus rücken.

Man darf gespannt sein was diesen Sommer so an News kommt wie seht ihr das ?  

289 Postings, 4231 Tage Kurt1989Neue Presentation Juni 2019 Monument Mining

 
  
    #4871
05.06.19 23:00
Hallo in die Runde es gibt einen neue Presenation und einen Fact Sheet wo wir sehen können was in 2019 noch so alles geplant ist.Was haltet ihr von den Zielen 2019 in diesem Sommer?

Es stehen für Murchsion eine PEA Studie und Recourcenschätzung aus
Und für Selinsing neue Bohrungen
Mengapur will man ein Intec Copper Testprogramm durchlaufen lassen was sich bei 96 Dollar pro Tonne Eisenerz und 6000 Dollar pro Tonne Kupfer lohnen dürfte diese Recource den Wert endlich festzustellen.

The aim for fiscal 2019 is to unlock value in our development assets by
progressing from studies into financing, construction, and then production

• Selinsing Gold Mine in Malaysia
- Place Sulphide Project into Production by converting the Selinsing Gold Processing
Plant to Sulphide process from Oxide.
• Murchison Gold Portfolio in Western Australia
- Complete a scoping study to assess underground opportunities and strategize
Burnakura production for secondary cash flow generation.
• Mengapur Copper-Iron Project in Malaysia
- Complete metallurgical testwork to work towards a feasibility study.

Our ultimate objective is to build on our current gold assets through
acquisitions and return value to our shareholders

Near-Term Objectives
- Take Selinsing Gold Mine to the next stage with sulphide production
- Bring Burnakura into gold production at Murchison
- Work towards a feasibility study at Mengapur


https://www.monumentmining.com/site/assets/files/...-06-04-cp-mmy.pdf

https://www.monumentmining.com/site/assets/files/...6-04-fact-mmy.pdf  

289 Postings, 4231 Tage Kurt1989CEO Newsletter so wie ich es gefordert habe

 
  
    #4872
12.06.19 20:13
Wenn das so 1 mal im Quartal kommt oki es Fehlen noch aktuelle Bilder von dem Projekten zu dem Newsletter dazu aber darauf kann man aufbauen.

June 12 2019

Message from the President & CEO

Dear Shareholders and Investors,

For more than 10 years, Monument Mining has been successfully operating its Selinsing Gold Mine in Malaysia with excellent performance at low cost. Now, the Company has the potential to sustain its production with fully replaced reserves by upgrading the existing plant for processing sulphide gold reserves.

The Feasibility Study announced in February 2019 is significant to Monument, and was done by mining consultants Snowden.  In summary, the result of Feasibility Study gives the entire Selinsing Project a six-year mine life from March 2018 based on the reserves of 267Koz. Assuming a gold price of $1300/oz, we would generate $290 million gross revenue, with an EBIT of close to $100 million at a cash cost of $864/oz. A higher gold price would provide even better project economics.

With estimated capital costs of $53 million including $35 million for the sulphide plant upgrade, our net cash flow would be approximate $45 million, net of capital investment and tax with a NPV of $27 million, a healthy IRR of 49%, and a 2.5 year payback period on capital. We are currently seeking debt financing to fund the project.

A plant conversion with a new flotation and BIOX® sulphide treatment would allow us to unlock the value of our sulphide assets. The estimated construction period is 12 months, and we aim to sustain current oxide production before sulphide production commences.

What we would also like to highlight to investors and shareholders is the fact that with a successful sulphide plant operation, Monument could toll mill or buy other existing sulphide gold concentrates within Malaysia or elsewhere. With oxide gold resources becoming scarce, the mining industry is increasingly relying on new technologies to treat sulphide ore. We are excited that we have demonstrated this capability to operate a sulphide plant in Malaysia.  

We are also confident that our gold inventory could be further increased by converting existing resources into reserves and have demonstrated those opportunities in detail in the Feasibility Study. Together with additional regional exploration around the Selinsing area, this provides us future flexibility for maximizing this strategic operational asset.

To the north of our existing ore bodies at Selinsing, we have announced a new discovery at Peranggih, which is on the same strike length of the Selinsing deposits. Based upon our structural geological interpretation, we have progressed an additional soil sampling program to cover additional areas at Peranggih; the samples have been prepared and are ready to be sent to an Australia laboratory for testwork. Trial mining at Peranggih has also been planned and preparation is underway.

Copper production is the current target for our Mengapur Project in Malaysia. It is a good time to look for a funding partner with the uptrend in copper and iron ore prices. With the increase in iron ore price, our third party operator is already working with us to re-start the free digging iron ore operation that would remove further overburden.  But it is too early to say that we have a near-term solution for copper production yet.  However, we have released an initial NI 43-101 technical report in October 2018 with a substantial mineral resource estimate of 90 million tonnes of total indicated and inferred copper resources at a grade of 0.43%/cu. With this in place, we do have some ideas on how we could unlock the value of Mengapur for our shareholders.

In Western Australia, Monument bought the Murchison Gold Project in the Meekatharra area with a 640Koz historical resource, including a CIL plant, a mine camp for approximately 108 people and a canteen. We have been working toward placing the project into production to generate a second source of cash flow.

During fiscal 2019 at Burnakura, we have increased our indicated and inferred resources to a total of 381,000 ounces (refer to NI43-101 Updated Mineral Resources, Burnakura Gold Project, prepared by SRK, Sedar filed July 2018).  Through our geological structural studies, we have identified regional exploration targets. To date, we have digitized other historical data into our database for further geological interpretation.  We plan to test the quality of those targets and then extend drilling programs down deep in July 2019, after the fiscal year end. In the meantime, we will progress with our mining development.

Our message to shareholders and potential new investors is that we have clear action plans in place to support an increase in our market value.  Here is a quick summary of our strategic actions in next two to three years:

1. The Feasibility Study gives us a foundation to support funding of the Selinsing Sulphide Project.  Once funding of the Selinsing Sulphide Gold Plant is in place, our production is expected to be back to a higher level, if the gold price maintains its current level (mid-$1,300USD) or goes higher. We also continue to improve the economic outcome through operations and further project optimization on the ground.

2. The Murchison exploration plan will be focused on regional exploration to explore overall potential. In 2019, Australian gold miners have shifted their attention to the Murchison, Cue and Meekatharra areas.

3. In parallel, as copper price and iron price continue to strengthen, it is a good time to unlock the value of Mengapur. We have attracted more attention to our Mengapur Project.

4. In the meantime we are diligently working on new opportunities that can advance Monument to a new stage which enhance overall value of the Company.

Over the last few years the mining industry has not been able to attract the market. The situation and outlook have become more positive in 2019.  With the overall market improvement showing more interest in mining, further success in Monument projects might let shareholders gain value for their long-term support. I am confident that Monument will get back on the radar of investors and analysts.

We also believe the gold price will be strong in the future due to a potentially weaker US dollar. In addition, with limited exploration around the world there is a lack of new deposits which is bullish for gold prices. Junior gold miners will benefit from such a scenario and could recover from their depressed share prices.

Sincerely,

Cathy Zhai, President and CEO  

289 Postings, 4231 Tage Kurt1989Bericht Aktionärstreffen Frankfurt

 
  
    #4873
09.07.19 16:50
Hallo hier einmal ein Bericht von mir

1 BIOX

Also man ist ja aktuell in Verhandlungen den BIOX Process zu finanzieren und möchte es schaffen bis Q 4 2020 eine BIOX Anlage in die Produktion zu bringen. Dazu hat BIOX einen großer Vorteil nähmlich das man andere Sulfidvorkommen oder Projekte aufkaufen könnte oder in Toll Mining abkommen Verarbeiten Damit es mit dem BIOX Process nicht so viele Schwierigkeiten gibt hat man die Gesamt Mannschaft die auf Selinsing Tätig ist auf die Philipinen gebracht zu einer Schulung an einer dort laufenden Mine https://www.metalsexploration.com/ Man möchte nicht das die Truppe von Monument Mining die gleichen Fehler beim start der BIOX Anlage macht sondern dieser Vermeiden kann das es Reibungsloser läuft außerdem möchte sich die Mannschaft mit der Truppe von Metals Exploration austauschen vllt "Gegenbesuch" wenn die Anlage steht das man bei Einstellung der Anlage helfen kann. Außerdem wurde mir noch erklärt wozu man BIOX braucht man hat 6 Pits die alle in Richtung Peranghi verlaufen 1,2,3 sind Selinsing,Buffalo Reef,Felda Land das ist Oxiderz aber 4 und 5 sind Suldiferz und können nicht gut verarbeitet werden aber Nr 6 Peranghi ist wieder Oxiderz und soll verarbeitet werden bis BIOX steht. Und die Pits sollen erweitert werden man sieht ja die Zufahrsstraßen zu den Pits an den Rändern werden sie nun Verbreitert um auch dort an die Oxidischen Unzen heran zu kommen das kostet aber im ersten moment Geld sollte sich aber auszahlen oder besser gesagt Zeit verschaffen) Zusätzliche Unzen um mehr Zeit zu haben. Stufenabbau sozusagen. man konzentriert alle Kräfte aktuell auf Finanzierung und Peranghi das man dort schonmal sicher ist und darauf aufbauen kann.


2 Geschwindigkeit der Arbeiten

Mir wurde auch erklärt warum das bei Monument Mining mit den Studie usw alles so lange dauert es ist so das man 1 Minen Ingeneur hat und in der Penjom Goldmine hatte man z.b 10 Mineningeneuere diese waren aber nur auf 1 Gebiete spezialisiert und konnten auch nur das bei Monument Mining möchte man die Leute dazu anhalten auch mehrere andere Gebiete sich auszukennen und weiterzubilden und bietet Schulungen an. Nur das möchten die meisten nicht die möchten in ihrem Büro sitzten vor Computern Modele erstellen von Recourcen und fertig. Außerdem wenn man Barrick Gold heißt muss man Wenig Salary zahlen aber bei kleineren Firmen werden für gute Leute extrem hohe Gehälter verlangt.
3 Finanzierung
Bei der Finanzierung sieht es so aus das man mit meinem Finanzkontakt in Gesprächen ist sehr intensiv aber sie durfte nichts sagen Verständlich nur man Plant im 4 Quartal 2020 zu Produzieren mit BIOX also schon ein Hinweis das da was geht.

4 Peranghi

Bei Peranghi wird die Strasse aktuell gebaut und es wird wohl auch ein paar Bilder geben auf der Webseite. Aber wie lange es dauert könnte sie nicht sagen. Aber was Positiv ist sie will auf Peranghi keine Recourcenschätzung machen weil halt "Nugget" effekte macht es Schwieriger sonder einen Test machen in der bestehenden Anlage ....so dieser Abschnitt läuft gut auf gehst mit der Produktion klar die Studien oder Recourcenschätzungen bringen was kosten aber sau viel Geld und bestätigen am Ende oft nur was man durch einen einfach Test 1 Woche laufen lassen durch die Anlage auch so rausfinden kann. Learning by doing genau nach meinem Geschmack auch auf dem Famehub Areal was ja viel größer ist möchte man so Verfahren um Geld und Zeit zu sparen.

Mengapur

Zu Mengapur muss ich sagen Streicht das Eisenerz auf eurem Kopf es ist so das Eisenerz ein "Beiprodukt" der Produktion ist was bei der Intec Copper Produktion anfällt. Man konzentriert sich auf Kupfer. Außerdem stehen Mengapur und Selinsing im Vordergrund es gibt eine neue Presentation dort wird erklärt was man bis 2021 umsetzten möchte und Australien wurde hinten angestellt. Aber man muss sagen das es viele Firmen gibt die daran interessiert sind eine Studie durchzuführen auf Mengapur um die Wirtschaftlichkeit herauszufinden. Dazu wird gerade die Intec Anlage nach Mengapur gebracht um vllt auch die Wirtschaftlichkeit zu Testen.. Zum Eisenerz es ist so Mengapur besteht auch 3 Teilen Area A , B und C auf dem Area A und B ist die Firma Malaco beschäftigt. Und dort soll auch Produziert werden aber auf Area C gibt es auch Eisenerz keine Frage aber das in nicht so großen Mengen wie auf A und B das wäre dann Beiprodukt bei der Produktion von Kupfer. Malaco macht aus 3 Tonnen Eisenoxid ca 1 Tonne Erz die Verkauft werden können.

3 Australien

So wie ich es verstanden habe wird Australien wohl hinten angestellt und wird erst bearbeitet wenn man mit Selinsing und Mengapur einigermaßen auf der Reihe ist. Malaysia ist ihre Kernkompetenz und dort wollen sie das Unternehmen aufbauen. Aber auch Cathy war wohl ehrlich und sagt sie braucht mindestens 2-3 Jahre Q 4 2020 steht ja erst Selinsing bei Finanzierung aber da ist man zuversichtlich. Durch die Zukäuft und die Exploration auf Selinsing und Umgebung will man von 6 Jahren aktuell auf 10 oder mehr Jahre an Minenleben kommen es gibt wohl einige Explorationsziele die Untersucht werden müssen. Famehub ist ja ein großes Areal das wurde noch gar nicht angetastet 32 000 Acres und Selinsing hat nur 800 Acres nur so zum Vergleich).

 

289 Postings, 4231 Tage Kurt1989Finanzierung

 
  
    #4874
10.08.19 12:44
Also so langsam könnte echt mal eine Finanzierung kommen für die BIOX Anlage wenn man damit im 4 Quartal 2020 wirklich in die Produktion starten will....  

289 Postings, 4231 Tage Kurt1989Monument mining Aktien zählen

 
  
    #4875
01.09.19 15:51
Hallo ich möchte bitte dazu aufrufen das wir alle einmal unsere Aktien zusammenzählen das Kanadische Forum ist bereit sich mit uns zu verbünden und bestimmte Teile des Managments bei 0 Leistung und 0 Value zu entfernen.

Ich habe 702 000 Aktien und Fange mal an .....es geht darum Robert Baldock am Ende des Jahre wenn möglich zu entfernen.  

Seite: < 1 | ... | 193 | 194 |
| 196 | 197 >  
   Antwort einfügen - nach oben